T1 Giga Arctic Data Center Conversion

Mo i Rana, Nordland, NorwayPermitted
Evidence
Planned / design
50 MW
Updated
Oct 28, 2026

T1 Energy received local approval to convert part of its Giga Arctic industrial campus in Mo i Rana into a data center. The company expects a 50 MW facility could operate in 2027 and holds a longer-term position for 396 MW in the grid queue. T1 Energy is associated with the development in Mo i Rana, Rana Municipality, Nordland, NO. The disclosed development scope includes 50 MW initial planned data center; rezoning approved; 396 MW grid-queue position. Power and physical infrastructure include brownfield industrial building with hydropower access and a grid-queue position. T1 expects that a 50 MW data center could be operational in 2027.

Capacity

Reported capacity

Planned / design or future potential

50 MW

Source

Reported capacity

Planned / design or future potential

50 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Development programAnnounced or preconstruction

Project-wide phase for T1 Giga Arctic Data Center Conversion; capacity class is design.

Milestones (2)
Giga Arctic Mo i Rana development disclosed

Aug 27, 2026 · Recorded actual event

Completed · Announced

Source not linked
Rezoning approved for data center conversion

Date not disclosed · Forecast / planned record

Forecast · Forecast completion

Source not linked

Participants

T1 Energy

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

Giga Arctic campus | Mo i Rana | Nordland | Norway

Source

Location context

Actual

Giga Arctic campus | Mo i Rana | Nordland | Norway

Source

Development scale

Actual

50 MW initial planned data center

Source

Development milestone

Actual

Rezoning approved

Source

Site configuration

Actual

Giga Arctic campus | Mo i Rana | Nordland | Norway

Source

Technical specifications

Power arrangement

Actual

396 MW grid queue position.

Source

Additional project facts

Lifecycle status

Actual

Permitted

Source

Capacity basis

Actual

T1 expects that a 50 MW data center could be operational in 2027.

Source

Lifecycle status

Actual

Permitted

Source

Capacity basis

Actual

T1 expects that a 50 MW data center could be operational in 2027.

Source

Infrastructure & permits

Technical details (2)
Electric grid

Planned or represented

50 MW

T1 expects that a 50 MW data center could be operational in 2027.

Site facility

Planned or represented

Brownfield industrial building with hydropower access and a grid-queue position.

Other · Issued

T1 Giga Arctic Data Center Conversion

Rana Municipality

Aug 27, 2026

Sources (2)