T1 Giga Arctic Data Center Conversion

Mo i Rana, Nordland, NorwayEntitled / Permitted
Capacity
50 MW
Planned / design
Lead participant
T1 Energy
Developer
Last updated
Aug 27, 2026
Most recent public record update

About T1 Giga Arctic Data Center Conversion

T1 Energy received local approval to convert part of its Giga Arctic industrial campus in Mo i Rana into a data center. The company expects a 50 MW facility could operate in 2027 and holds a longer-term position for 396 MW in the grid queue. T1 Energy is associated with the development in Mo i Rana, Rana Municipality, Nordland, NO. The disclosed development scope includes 50 MW initial planned data center; rezoning approved; 396 MW grid-queue position. Power and physical infrastructure include brownfield industrial building with hydropower access and a grid-queue position. T1 expects that a 50 MW data center could be operational in 2027.

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Design50 MWDesign · T1 Giga Arctic Data Center Conversion
Design50 MWDesign · T1 Giga Arctic Data Center Conversion

Development

1 phases · 2 milestones
Development programAnnounced Or Preconstruction

Project-wide phase for T1 Giga Arctic Data Center Conversion; capacity class is design.

Aug 27, 2026
Giga Arctic Mo i Rana development disclosed
Completed
Rezoning approved for data center conversion
Forecast

Infrastructure

Electric GridPlanned Or Represented

50 MW

T1 expects that a 50 MW data center could be operational in 2027.

Site FacilityPlanned Or Represented

Brownfield industrial building with hydropower access and a grid-queue position.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Site systems: 1

Facts & sources

Published claims and their source links.

12 facts
Location Context
Giga Arctic campus | Mo i Rana | Nordland | Norway
Actual
Lifecycle Status
Permitted
Actual
Reported Capacity
50 MW
Design
Capacity Basis
T1 expects that a 50 MW data center could be operational in 2027.
Actual
Location Context
Giga Arctic campus | Mo i Rana | Nordland | Norway
Actual
Lifecycle Status
Permitted
Actual
Reported Capacity
50 MW
Design
Capacity Basis
T1 expects that a 50 MW data center could be operational in 2027.
Actual
Development Scale
50 MW initial planned data center
Actual
Development Milestone
Rezoning approved
Actual
Power Arrangement
396 MW grid queue position.
Actual
Site Configuration
Giga Arctic campus | Mo i Rana | Nordland | Norway
Actual