STT GDC reports groundbreaking on March 16, 2026 for the first Palava data center building, designed for 50 MW of IT load. The wider campus’s approximately 400 MW potential is separate and is not operating capacity. STT Palava 1 Data Center is a separately tracked under development STT GDC facility in Palava, Maharashtra, IN. The current operator catalog states 50 MW of IT load for this building; Cartis treats planned values as future facility boundaries and operating values as installed capacity, never as measured tenant draw. Independent Palava evidence supports the physical campus and lifecycle context without transferring portfolio totals to this record. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
STT Palava 1 Data Center is a separately tracked under development STT GDC facility in Palava, Maharashtra, IN. The current operator catalog states 50 MW of IT load for this building; Cartis treats planned values as future facility boundaries and operating values as installed capacity, never as measured tenant draw. Independent Palava evidence supports the physical campus and lifecycle context without transferring portfolio totals to this record. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.
Milestones (1)
Jan 28, 2026 · Recorded actual event
Completed · Status changed
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- STT Palava 1 Data Center official profile · Aug 28, 2026 · Primary
Site & development
Additional project facts
Infrastructure & permits
Technical details (4)
Planned or represented
50 MW
Published IT design boundary; utility service and operating load remain distinct.
Planned or represented
Carrier-neutral or resilient fibre connectivity described for the individual facility.
Planned or represented
3,000 MW
Parent-park power availability across several operators; not this facility’s IT load.
Planned or represented
100 MLD
Parent-park reclaimed-water capability; facility allocation undisclosed.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (4)
Under construction · Palava, Maharashtra, India
Same locality: Palava · Shared participant: STT GDC India
Compare in a collectionUnder construction · Palava, Maharashtra, India
Same locality: Palava · Shared participant: STT GDC India
Compare in a collectionOperating · Navi Mumbai, Maharashtra, India
Shared participant: STT GDC India · Same market: Maharashtra, India
Compare in a collectionUnder construction · Navi Mumbai, Maharashtra, India
Shared participant: STT GDC India · Same market: Maharashtra, India
Compare in a collection