Data center siteSite record

Stillwater Technology Park — Lovejoy

Lovejoy, Georgia, United StatesCancelled
Capacity
1,250 MW
Utility capacity
Lead participant
Stillwater Development LLC
Developer
Last updated
Aug 25, 2026
Most recent public record update

About Stillwater Technology Park — Lovejoy

A withdrawn proposal at Panhandle Road. Historical service and development envelopes. Stillwater Technology Park — Lovejoy is located in Lovejoy, GA, US and is a data center campus in cancelled status. Participants include Stillwater Development LLC as developer, Central Georgia EMC as utility provider. Published specifications include 1.25 GW of grid or utility-service capacity, 0 MW of stated capacity. Development comprises Historical full-campus proposal (cancelled). Key milestones include Developer formally withdraws the data center proposal (2026-08-06) and Historical DRI completion estimate superseded by withdrawal (2031-12-31). proposed grid connection — 1.25 GW: Historical requested service/grid connection; not IT load and no longer an active project. proposed substations — 2 substations: Historical reported substation count; no executed interconnection verified. Permitting includes Development of Regional Impact initial information form #4794 for Stillwater Technology Park (proposal withdrawn) and Rezoning from ANX to RA for 0, 11760 and 11762 Panhandle Road (withdrawn or superseded).

Capacity

Utility capacity
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.

No additional capacity claims are published.

Development

1 phases · 4 milestones
Historical full-campus proposalChanged Or Cancelled

Historical sources report a 15-building envelope, while the DRI total floor area conflicts with the reported per-building area.

15 buildings

Dec 15, 2025
Lovejoy considers rezoning for Panhandle Road parcels
Completed
Jul 22, 2026
Georgia DRI #4794 records the campus proposal
Completed
Aug 6, 2026
Developer formally withdraws the data center proposal
Completed
Dec 31, 2031
Historical DRI completion estimate superseded by withdrawal
Cancelled

Infrastructure

Electric GridCancelled Or Not Proceeding

1.25 GW

Historical requested service/grid connection; not IT load and no longer an active project.

Electric GridCancelled Or Not Proceeding

2 substations

Historical reported substation count; no executed interconnection verified.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
2

No map point available

Power & interconnection: 2

Facts & sources

Published claims and their source links.

9 facts
Proposal Site Address
11760 Panhandle Road
Actual
Historical Proposed Floor Area
3,465,000 square feet
Actual
Historical Rezoning Area
363.71 acres
Actual
Historical Reported Building Count
15
Actual
Historical Proposed Grid Connection
1.25 GW
Actual
Historical Reported Substation Count
2 substations
Actual
Historical Potential Investment
$13 billion
Actual
Historical Estimated Completion
2031-12-31
Actual
Proposal Withdrawn
True
Actual