STT Jakarta 1 Data Center
- Planned critical IT
- 18 MW
- Updated
- Oct 28, 2026
STT Jakarta 1 Data Center is a separately tracked operating STT GDC facility in Cikarang, West Java, ID. The current operator catalog states 18 MW of IT load for this building; Cartis treats planned values as future facility boundaries and operating values as installed capacity, never as measured tenant draw. Independent Jakarta evidence supports the physical campus and lifecycle context without transferring portfolio totals to this record. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
STT Jakarta 1 Data Center is a separately tracked operating STT GDC facility in Cikarang, West Java, ID. The current operator catalog states 18 MW of IT load for this building; Cartis treats planned values as future facility boundaries and operating values as installed capacity, never as measured tenant draw. Independent Jakarta evidence supports the physical campus and lifecycle context without transferring portfolio totals to this record. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.
Milestones (1)
Jun 2023 · Recorded actual event
Completed · Commercial operation
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- STT Jakarta 1 Data Center official profile · Aug 28, 2026 · Primary
Site & development
Additional project facts
Capacity basis
ActualST Telemedia Global Data Centres publishes 18 MW of IT load for this facility.
SourceCapacity basis
Actual18 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
SourceFacility capacity basis
Actual18 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
SourceInfrastructure & permits
Technical details (3)
Operational
18 MW
Facility IT boundary; customer utilization is not disclosed.
Operational
Carrier-neutral or resilient fibre connectivity described for the individual facility.
Operational
150 kV
Dedicated campus substation with multiple PLN feeds; shared infrastructure, not facility IT capacity.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (4)
Operating · Cikarang, West Java, Indonesia
Same locality: Cikarang · Shared participant: ST Telemedia Global Data Centres
Compare in a collectionUnder construction · Cikarang, West Java, Indonesia
Same locality: Cikarang · Shared participant: ST Telemedia Global Data Centres
Compare in a collectionUnder construction · Cikarang, West Java, Indonesia
Same locality: Cikarang · Shared participant: ST Telemedia Global Data Centres
Compare in a collectionUnder construction · Cikarang, West Java, Indonesia
Same locality: Cikarang · Shared participant: ST Telemedia Global Data Centres
Compare in a collection