Switch Austin Rock Campus
- Planned critical IT
- 285 MW
- Updated
- Oct 28, 2026
Switch’s Rock Campus is operating in phases north of Austin, with up to 1.5 million square feet and 285 MW only at full completion. The city agreement is recorded as a structured municipal incentive and development instrument without inventing a realized benefit. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
Switch’s Rock Campus is operating in phases north of Austin, with up to 1.5 million square feet and 285 MW only at full completion. The city agreement is recorded as a structured municipal incentive and development instrument without inventing a realized benefit. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
Participants
Developer
Sources by role
Developer (1)
- Switch Austin Rock Campus official profile · Aug 28, 2026 · Primary
Capital & incentives
Incentives
Grant
Approved · City of Round Rock
Agreement terms apply to the Round Rock project; no unsupported realized-benefit amount is imported.
Site & development
Additional project facts
Capacity basis
Actual285 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
SourceCapacity basis
Actual285 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
SourceIdentity boundary
ActualThis facility or named campus is tracked separately from adjacent buildings and broader operator portfolios
SourceInfrastructure & permits
Technical details (3)
Operational
285 MW
285 MW is the operator-published facility IT-load boundary; it is not measured customer utilization.
Operational
Carrier-neutral or resilient fibre connectivity is described for the individual facility.
Operational
Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.
Project map
Other · Issued
Switch Rock Campus
City of Round Rock
May 1, 2023
Sources (1)
- Switch economic development agreement · May 1, 2023 · Primary
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (3)
Operating · Round Rock, Texas, United States
Same locality: Round Rock
Compare in a collectionUnder construction · Round Rock, Texas, United States