Switch Tahoe Reno Citadel Campus

Tahoe Reno Industrial Center, Nevada, United StatesOperating / Stabilized
Capacity
850 MW
Planned / design
Lead participant
Capital Dynamics
Developer
Last updated
Aug 25, 2026
Most recent public record update

About Switch Tahoe Reno Citadel Campus

One multi-building Switch campus; successive completion envelopes are dated master-plan claims rather than current load. Switch Tahoe Reno Citadel Campus is in Tahoe Reno Industrial Center, NV, US and is a data center campus with operational status. Participants include Switch as developer, NV Energy as utility, DigitalBridge as owner, IFM Investors as owner. Published specifications include 650 MW future potential, 130 MW design capacity, 850 MW future potential. Development comprises Tahoe Reno 1 (operational), Tahoe Reno 2 (under construction), Tahoe Reno 3 (preconstruction). Key milestones include TR2 construction and TR3 site preparation announced. (2021-06-01) and Switch take-private completed. (2022-12-06). renewable power supply: Switch markets 100% green power; current contract mechanics require refresh. offsite solar generation — 127 MW: Storey County component of Gigawatt 1. Permitting includes campus building and incentive records for Tahoe Reno Citadel (partially verified). Incentives include data center tax abatement program eligibility (program eligibility not project award) for Switch markets Nevada eligibility including up to 75% personal-property abatement and 2% sales/use tax; no Citadel-specific award terms are asserted.

Projects sharing a market, utility, or organization.

2 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Future Potential650 MWFact · Switch Tahoe Reno Citadel Campus
Design130 MWFact · Switch Tahoe Reno Citadel Campus
Future Potential850 MWFact · Switch Tahoe Reno Citadel Campus
Onsite Generation127 MWFact · Switch Tahoe Reno Citadel Campus

Development

3 phases · 3 milestones
Tahoe Reno 1Operational

First campus building opened in 2017.

1 building

Tahoe Reno 2Under Construction

Current commissioning status remains to be verified.

1 building

Tahoe Reno 3Announced Or Preconstruction

Current delivery stage remains to be verified.

1 building

Feb 15, 2017
Tahoe Reno 1 opened
Completed
Jun 1, 2021
TR2 construction and TR3 site preparation announced
Completed
Dec 6, 2022
Switch take-private completed
Completed

Infrastructure

Renewable Energy SupplyOperational

Switch markets 100% green power; current contract mechanics require refresh.

Renewable Energy SupplyUnder Construction

127 MW

Storey County component of Gigawatt 1.

Battery StorageUnder Construction

240 MWh

Storey County component of Gigawatt 1.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
2

No map point available

Power & interconnection: 2Generation & storage: 1

Facts & sources

Published claims and their source links.

14 facts
Site Area 2017
2,000 acres
Fact
Buildout Floor Area 2017
7,200,000 square feet
Fact
Buildout Power 2017
650 MW
Fact
Tr1 Floor Area
1,300,000 square feet
Fact
Tr1 Power Capacity
130 MW
Fact
Tr1 Commitment Status
More than 80% committed
Fact
Site Area Current Marketing
3,058 acres
Fact
Buildout Floor Area Newer
17,400,000 square feet
Fact
Buildout Power Newer
850 MW
Fact
Completion Power Label
Multi gigawatt
Fact
Power Attribute
100% Green power
Fact
Storey Solar Capacity
127 MW
Fact
Storey Battery Energy
240 MWh
Fact
Corporate Take Private Value
$11,000 millions
Fact