Switch Tahoe Reno Citadel Campus
- Planned / design
- 850 MW
- Updated
- Oct 28, 2026
- Utility
- NV Energy
One multi-building Switch campus; successive completion envelopes are dated master-plan claims rather than current load. Switch Tahoe Reno Citadel Campus is in Tahoe Reno Industrial Center, NV, US and is a data center campus with operational status.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
1 building
First campus building opened in 2017.
1 building
Current commissioning status remains to be verified.
1 building
Current delivery stage remains to be verified.
Milestones (3)
Feb 15, 2017 · Recorded actual event
Completed · Event type not stated
Source not linkedJun 2021 · Recorded actual event
Completed · Event type not stated
Source not linkedDec 6, 2022 · Recorded actual event
Completed · Event type not stated
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- Switch and Capital Dynamics break ground on Gigawatt Nevada · Jul 1, 2020 · Primary
Owner
Sources by role
Owner (1)
- DigitalBridge and IFM complete USD11 billion take-private of Switch · Dec 6, 2022 · Primary
Owner (1)
- Switch asset-management case study · Corroborating
Owner
Sources by role
Owner (1)
- DigitalBridge and IFM complete USD11 billion take-private of Switch · Dec 6, 2022 · Primary
Owner (1)
- Switch asset-management case study · Corroborating
Developer
Sources by role
Developer (1)
- Switch Tahoe Reno data center now open · Feb 15, 2017 · Primary
Developer (1)
- Tahoe Reno Citadel Campus · Corroborating
Other participants (3)
Government authority
Sources by role
Government authority (1)
- Nevada tax advantages · Primary
Government authority (1)
- Nevada data-center tax abatements · Corroborating
Utility provider
Sources by role
Utility provider (1)
- Switch ESG Report 2021 · Oct 1, 2022 · Corroborating
Utility provider (1)
- Switch and Capital Dynamics break ground on Gigawatt Nevada · Jul 1, 2020 · Primary
Government authority
Sources by role
Government authority (1)
- Switch Tahoe Reno data center now open · Feb 15, 2017 · Primary
Capital & incentives
Capital claims
Incentives
Incentive
75%
Status not stated · Nevada Governor's Office of Economic Development
Switch markets Nevada eligibility including up to 75% personal-property abatement and 2% sales/use tax; no Citadel-specific award terms are asserted.
Site & development
Technical specifications
Additional project facts
Infrastructure & permits
Technical details (3)
Operational
Switch markets 100% green power; current contract mechanics require refresh.
Under construction
127 MW
Storey County component of Gigawatt 1.
Under construction
240 MWh
Storey County component of Gigawatt 1.
Project map
Permit · Status not stated
Tahoe Reno Citadel
Storey County
Sources (3)
- Switch breaks ground on second and third Tahoe Reno data centers · Jun 1, 2021 · Primary
- Nevada tax advantages · Corroborating
- Nevada data-center tax abatements · Corroborating
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (2)
Under construction · Sparks / Reno market, Nevada, United States
Shared participant: NV Energy · Shared participant: Storey County · Same market: Nevada, United States
Compare in a collectionPartially operational · Las Vegas, Nevada, United States
Shared participant: Switch · Same market: Nevada, United States
Compare in a collection