Switch Grand Rapids Pyramid Campus
- Planned critical IT
- 237 MW
- Updated
- Oct 28, 2026
Switch’s Pyramid Campus occupies the former Steelcase Pyramid and is already operating while further full-build capacity remains possible. The current 237 MW boundary supersedes the older 320 MW opening-era description and is treated as potential, not live draw. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
Switch’s Pyramid Campus occupies the former Steelcase Pyramid and is already operating while further full-build capacity remains possible. The current 237 MW boundary supersedes the older 320 MW opening-era description and is treated as potential, not live draw. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
Milestones (1)
Mar 15, 2017 · Recorded actual event
Completed · Commercial operation
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- Switch Grand Rapids Pyramid Campus official profile · Aug 28, 2026 · Primary
Site & development
Technical specifications
Additional project facts
Capacity basis
Actual237 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
SourceCapacity basis
Actual237 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
SourceIdentity boundary
ActualThis facility or named campus is tracked separately from adjacent buildings and broader operator portfolios
SourceInfrastructure & permits
Technical details (3)
Operational
237 MW
237 MW is the operator-published facility IT-load boundary; it is not measured customer utilization.
Operational
Carrier-neutral or resilient fibre connectivity is described for the individual facility.
Operational
Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.