STT Singapore 6 Data Center
- Planned critical IT
- 40 MW
- Updated
- Oct 28, 2026
STT Singapore 6 Data Center is a separately tracked operating STT GDC facility in Singapore, Singapore, SG. The current operator catalog states 40 MW of IT load for this building; Cartis treats planned values as future facility boundaries and operating values as installed capacity, never as measured tenant draw. Independent Singapore evidence supports the physical campus and lifecycle context without transferring portfolio totals to this record. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
STT Singapore 6 Data Center is a separately tracked operating STT GDC facility in Singapore, Singapore, SG. The current operator catalog states 40 MW of IT load for this building; Cartis treats planned values as future facility boundaries and operating values as installed capacity, never as measured tenant draw. Independent Singapore evidence supports the physical campus and lifecycle context without transferring portfolio totals to this record. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.
Milestones (1)
Dec 5, 2024 · Recorded actual event
Completed · Status changed
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- STT Singapore 6 Data Center official profile · Aug 28, 2026 · Primary
Site & development
Additional project facts
Capacity basis
ActualST Telemedia Global Data Centres publishes 40 MW of IT load for this facility.
SourceCapacity basis
Actual40 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
SourceFacility capacity basis
Actual40 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
SourceInfrastructure & permits
Technical details (2)
Operational
40 MW
Facility IT boundary; customer utilization is not disclosed.
Operational
Carrier-neutral or resilient fibre connectivity described for the individual facility.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.