Surry Green Energy Center

Surry, Virginia, United StatesProposed
Evidence
Planned / design
1,000 MW
Updated
Oct 28, 2026

Surry Green Energy Center is a proposed energy-and-data center development on a roughly 600-acre site in Surry County, Virginia. Public economic-development materials frame the concept around carbon-free power, data centers, hydrogen and possible small modular reactors; the earlier 1 GW data center figure remains a planning estimate.

Capacity

Reported capacity

Planned / design or future potential

1,000 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Concept and site-development planningAnnounced or preconstruction

Surry Green Energy Center is a proposed energy-and-data center development on a roughly 600-acre site in Surry County, Virginia. Public economic-development materials frame the concept around carbon-free power, data centers, hydrogen and possible small modular reactors; the earlier 1 GW data center figure remains a planning estimate.

Milestones (1)
County materials presented the Green Energy Center vision

Feb 2024 · Recorded actual event

Completed · Announced

Source not linked

Participants

Green Energy Partners

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

Surry Green Energy Center | Surry | Virginia | US

Source

Site area

Actual

600 acres

Source

Developable area

Actual

481 acres

Source

Development concept

Actual

Data centers with carbon free energy options

Source

Additional project facts

Lifecycle status

Actual

Proposed

Source

Capacity basis

Actual

1,000 MW future full build site capacity; not measured operating IT load.

Source

Capacity status

Actual

1,000 MW remains a planning estimate

Source

Infrastructure & permits

Technical details (1)
Site facility

Planned or represented

1,000 MW

Concept includes data centers, SMRs and hydrogen; no operating IT load verified.

Public-source research. Plans may change. See Evidence for sources and qualifications.