Summit Elk Grove Village Data Center

Elk Grove Village, Illinois, United StatesOperating
Evidence
Planned critical IT
36.4 MW
Updated
Oct 28, 2026

Summit’s Elk Grove Village data center is an operating 485,000-square-foot facility at 2200 Busse Road. It provides 36.4 MW of critical load through four diverse 34.5 kV feeds, 33 rotary UPS systems and 33 generators, with three diverse fiber paths to Chicago’s 350 East Cermak carrier hub. The facility is the former Deft Elk Grove operation and is maintained as one canonical site.

Capacity

Reported capacity

Actual

36.4 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Elk Grove Village facilityOperational

Operating carrier-grade colocation facility.

Participants

Summit

Operator

Sources by role
Operator (1)
Operator (1)

Site & development

Building area

Actual

485,000 sq. ft.

Source

Raised floor area

Actual

275,000 sq. ft.

Source

Infrastructure & permits

Technical details (3)
Electric grid

Operational

36.4 MW

Critical load supplied by four diverse 34.5 kV feeds.

Onsite generation

Operational

74.25 MW

Thirty-three 2.25 MW diesel generators; nameplate is not IT capacity.

Fiber

Operational

3 paths

Diverse fiber paths to 350 East Cermak.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (2)
Centersquare ORD2 Elk Grove Village Data Center

Operating · Elk Grove Village, Illinois, United States

Same locality: Elk Grove Village

Compare in a collection
Prime Chicago ORD01 Data Center Campus

Partially operational · Elk Grove Village, Illinois, United States

Same locality: Elk Grove Village

Compare in a collection