Switch Las Vegas Core Campus
- Planned critical IT
- 495 MW
- Updated
- Oct 28, 2026
Switch’s Core Campus is an operating, multi-building Las Vegas ecosystem that can reach 495 MW only upon full completion. The profile keeps active air-permit context, renewable-energy claims and the LAS VEGAS 10 milestone separate from measured tenant utilization. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
Switch’s Core Campus is an operating, multi-building Las Vegas ecosystem that can reach 495 MW only upon full completion. The profile keeps active air-permit context, renewable-energy claims and the LAS VEGAS 10 milestone separate from measured tenant utilization. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
Milestones (1)
Dec 2021 · Recorded actual event
Completed · Commercial operation
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- Switch Las Vegas Core Campus official profile · Aug 28, 2026 · Primary
Site & development
Technical specifications
Additional project facts
Capacity basis
Actual495 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
SourceCapacity basis
Actual495 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
SourceIdentity boundary
ActualThis facility or named campus is tracked separately from adjacent buildings and broader operator portfolios
SourceInfrastructure & permits
Technical details (3)
Operational
495 MW
495 MW is the operator-published facility IT-load boundary; it is not measured customer utilization.
Operational
Carrier-neutral or resilient fibre connectivity is described for the individual facility.
Operational
Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.
Project map
Air authorization · Issued
Switch Las Vegas Core Campus
Clark County Division of Air Quality
Aug 29, 2026
Sources (1)
- Active Title V permits · Aug 29, 2026 · Primary
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (2)
Operating · Las Vegas, Nevada, United States
Same locality: Las Vegas
Compare in a collectionOperating · Tahoe Reno Industrial Center, Nevada, United States
Shared participant: Switch · Same market: Nevada, United States
Compare in a collection