Switch Las Vegas Core Campus

Las Vegas, Nevada, United StatesPartially operational
Evidence
Planned critical IT
495 MW
Updated
Oct 28, 2026

Switch’s Core Campus is an operating, multi-building Las Vegas ecosystem that can reach 495 MW only upon full completion. The profile keeps active air-permit context, renewable-energy claims and the LAS VEGAS 10 milestone separate from measured tenant utilization. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Capacity

Reported capacity

Design

495 MW

Source

Reported capacity

Design

495 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionOperational

Switch’s Core Campus is an operating, multi-building Las Vegas ecosystem that can reach 495 MW only upon full completion. The profile keeps active air-permit context, renewable-energy claims and the LAS VEGAS 10 milestone separate from measured tenant utilization. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Milestones (1)
Switch opened LAS VEGAS 10

Dec 2021 · Recorded actual event

Completed · Commercial operation

Source not linked

Participants

Switch

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

Switch The Core | Las Vegas | NV | US

Source

Location context

Actual

Switch The Core | Las Vegas | NV | US

Source

Project location

Actual

Las Vegas, NV, US

Source

Technical specifications

Renewable energy claim

Actual

100 percent

Source

Additional project facts

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

Switch publishes 495 MW of IT power for this project boundary.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

495 MW is the operator published facility IT-load boundary; it is not measured customer utilization.

Source

Operator confirmed

Actual

Switch

Source

Current lifecycle

Actual

Partly operating with phased delivery or expansion underway

Source

Capacity classification

Actual

It load

Source

Capacity basis

Actual

495 MW is the operator published facility IT-load boundary; it is not measured customer utilization.

Source

Customer utilization

Actual

Not publicly disclosed

Source

Identity boundary

Actual

This facility or named campus is tracked separately from adjacent buildings and broader operator portfolios

Source

Source refresh date

Actual

2026-08-29

Source

Infrastructure & permits

Technical details (3)
Electric grid

Operational

495 MW

495 MW is the operator-published facility IT-load boundary; it is not measured customer utilization.

Fiber

Operational

Carrier-neutral or resilient fibre connectivity is described for the individual facility.

Cooling system

Operational

Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.

Air authorization · Issued

Switch Las Vegas Core Campus

Clark County Division of Air Quality

Aug 29, 2026

Sources (1)

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (2)
DataBank LAS1 Las Vegas Data Center

Operating · Las Vegas, Nevada, United States

Same locality: Las Vegas

Compare in a collection
Switch Tahoe Reno Citadel Campus

Operating · Tahoe Reno Industrial Center, Nevada, United States

Shared participant: Switch · Same market: Nevada, United States

Compare in a collection