Skip to content

AI data center sites

Search sites, programs and supporting energy records by location, company, status or capacity.

1,114 public records · About catalogue coverage

Search property-level records across markets, participants, capacity, development activity, infrastructure and supporting evidence.

1,043 site records69 program records2 energy assets / agreements1,105 detailed profiles9 sourced research records

Record types partition the public catalogue; detailed and sourced-research labels describe those same records, not additional sites. Site records are not a deduplicated count of physical campuses. Overlapping campus, phase or tenant scopes must not be added together.

Site and program directory

1,114 results · Page 21 of 23
Capacity stages and scopes differ; do not add figures together. How to compare

726 of 1114 matching records have an eligible headline. Select both basis and stage for a like-for-like view. Bounds, physical scope and reporting dates still differ; this is not an additive capacity total.

TAC Data Centers - Wythe CountySite · Connected record
Fort Chiswell, Virginia, United States
TAC Data Centers
Proposed
1,000 MW
Basis: Basis not specifiedPlanned / design
TAC Data Centers
Oct 28, 2026
Talen Energy Montour Data CenterSite · Connected record
Anthony Township, Pennsylvania, United States
Talen Energy
Proposed
Not establishedIn published records
Talen Energy
Oct 28, 2026
TECfusions Keystone Connect AI CampusSite · Connected record
Upper Burrell Township, Pennsylvania, United States
TECfusions
Proposed
3,000 MW
Basis: Basis not specifiedPlanned / design
TECfusions
Oct 28, 2026
Telia Strängnäs Sovereign AI Service DeploymentSite · Connected record
Strängnäs, Södermanland, Sweden
Telia CompanyTelia Cygate
Preconstruction
Not establishedIn published records
Telia Cygate
Oct 28, 2026
TELUS Rimouski Sovereign AI FactorySite · Connected record
Rimouski, Quebec, Canada
AccentureHewlett Packard Enterprise
Operating
Not establishedIn published records
TELUS
Oct 28, 2026
Teraco Cape Town Data Center PlatformProgram · Connected record
Cape Town, WC, South Africa
Digital Realty TrustNOA Group
Status under review
Not establishedIn published records
Digital Realty Trust
Oct 28, 2026
Teraco CT1 RondeboschSite · Connected record
Rondebosch, Cape Town, WC, South Africa
Digital Realty TrustTeraco Data Environments
Operating
3 MW
Basis: Critical ITPlanned critical IT
Digital Realty Trust
Oct 28, 2026
Teraco CT2 BrackenfellSite · Connected record
Brackenfell, Cape Town, WC, South Africa
Digital Realty TrustTeraco Data Environments
Operating
50 MW
Basis: Critical ITPlanned critical IT
Digital Realty Trust
Oct 28, 2026
Teraco Free State Solar PV PlantSite · Connected record
Free State province, FS, South Africa
EskomJUWI Renewable Energies South Africa
Construction
Not establishedIn published records
Subsolar
Oct 28, 2026
TeraWulf Chesapeake Data & Energy CampusSite · Connected record
Morgantown, Maryland, United States
TeraWulf
Permitted
800 MW
Basis: Critical ITPlanned critical IT
TeraWulf
Oct 28, 2026
TeraWulf Justified Data Hawesville CampusSite · Connected record
Hawesville, Kentucky, United States
AnthropicTeraWulf
Construction
401 MW
Basis: Basis not specifiedContracted
TeraWulf
Oct 28, 2026
TeraWulf Lake Hawkeye Data CampusSite · Connected record
Lansing, New York, United States
TeraWulf
Permitted
320 MW
Basis: Critical ITPlanned critical IT
TeraWulf
Oct 28, 2026
TeraWulf Muskie Data CampusSite · Connected record
Grayson, Kentucky, United States
Kentucky PowerTeraWulf
Preconstruction
800 MW
Basis: Critical ITPlanned critical IT
TeraWulf
Oct 28, 2026
Terranova Campinas CampusSite · Connected record
Campinas, near Unicamp, São Paulo, Brazil
ActisGeneral Atlantic
Preconstruction
Not establishedIn published records
General Atlantic
Oct 28, 2026
Terranova Querétaro CampusSite · Connected record
Querétaro area, QUE, Mexico
ActisGeneral Atlantic
Partially operational
20 MW
Basis: Critical ITPlanned critical IT
General Atlantic
Oct 28, 2026
TierPoint Boston–Marlborough Data CenterSite · Connected record
Marlborough, Massachusetts, United States
TierPoint
Operating
Not establishedIn published records
TierPoint
Oct 28, 2026
TierPoint Seattle Data CenterSite · Connected record
Seattle, Washington, United States
TierPoint
Operating
Not establishedIn published records
TierPoint
Oct 28, 2026
Tract Buckeye Technology ParkSite · Connected record
Buckeye, Arizona, United States
Tract
Preconstruction
1,800 MW
Basis: Basis not specifiedPlanned / design
Tract
Oct 28, 2026
Tract Des MoinesSite · Connected record
Altoona, Iowa, United States
Tract
Proposed
1,000 MW
Basis: Basis not specifiedPlanned / design
Tract
Oct 28, 2026
Tract Illinois (Morris)Site · Connected record
Morris, Illinois, United States
Tract
Proposed
1,000 MW
Basis: Basis not specifiedPlanned / design
Tract
Oct 28, 2026
Tract Silver Springs Technology ParkSite · Connected record
Silver Springs, Nevada, United States
Tract
Preconstruction
1,600 MW
Basis: Basis not specifiedPlanned / design
Tract
Oct 28, 2026
Tract Tuckahoe Technology ParkSite · Connected record
Manakin-Sabot, Virginia, United States
Tract
Proposed
900 MW
Basis: Basis not specifiedPlanned / design
Tract
Oct 28, 2026
TRG HOU1 Houston Data CenterSite · Connected record
Spring, Texas, United States
TRG Datacenters
Operating
6 MW
Basis: Utility / grid serviceUtility capacity
TRG Datacenters
Oct 28, 2026
True IDC Eastern Economic Corridor AI Data CenterSite · Connected record
Chonburi, Thailand
True IDC
Construction
250 MW
Basis: Basis not specifiedPlanned / design
True IDC
Oct 28, 2026
US Signal AZ01 Phoenix Data CenterSite · Connected record
Gilbert, Arizona, United States
US Signal
Operating
0.5 MW
Basis: Basis not specifiedPlanned / design
US Signal
Oct 28, 2026
US Signal IA01 Des Moines Data CenterSite · Connected record
Waukee, Iowa, United States
US Signal
Operating
0.2 MW
Basis: Critical ITPlanned critical IT
US Signal
Oct 28, 2026
US Signal IN01 Indianapolis Data CenterSite · Connected record
Indianapolis, Indiana, United States
US Signal
Operating
0.3 MW
Basis: Basis not specifiedPlanned / design
US Signal
Oct 28, 2026
US Signal IN02 Indianapolis Data CenterSite · Connected record
Indianapolis, Indiana, United States
US Signal
Operating
1.6 MW
Basis: Basis not specifiedPlanned / design
US Signal
Oct 28, 2026
US Signal MI03 Detroit Data CenterSite · Connected record
Belleville, Michigan, United States
US Signal
Operating
1.5 MW
Basis: Basis not specifiedPlanned / design
US Signal
Oct 28, 2026
US Signal MN01 Minneapolis Data CenterSite · Connected record
Eden Prairie, Minnesota, United States
US Signal
Operating
0.5 MW
Basis: Critical ITPlanned critical IT
US Signal
Oct 28, 2026
US Signal OR01 Bend Data CenterSite · Connected record
Bend, Oregon, United States
US Signal
Operating
Not establishedIn published records
US Signal
Oct 28, 2026
US Signal WI02 Madison Data CenterSite · Connected record
Fitchburg, Wisconsin, United States
US Signal
Operating
0.6 MW
Basis: Critical ITPlanned critical IT
US Signal
Oct 28, 2026
ValorC3 St. George Data CenterSite · Connected record
St. George, Utah, United States
ValorC3
Operating
4 MW
Basis: Basis not specifiedPlanned / design
ValorC3
Oct 28, 2026
Vantage BER1 Berlin Data Center CampusSite · Connected record
Berlin area, Brandenburg, Germany
Vantage Data Centers
Partially operational
56 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage BER2 Mittenwalde Data Center CampusSite · Connected record
Mittenwalde, Brandenburg, Germany
Vantage Data Centers
Partially operational
32 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage CA1 Santa Clara Data Center CampusSite · Connected record
Santa Clara, California, United States
Silicon Valley PowerVantage Data Centers
Operating
77 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage CA2 Santa Clara Data Center CampusSite · Connected record
Santa Clara, California, United States
Silicon Valley PowerVantage Data Centers
Partially operational
75 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage CA3 Santa Clara Data CenterSite · Connected record
Santa Clara, California, United States
Silicon Valley PowerVantage Data Centers
Construction
64 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage CWL1 Cardiff Data Center CampusSite · Connected record
Newport, Wales, United Kingdom
Vantage Data Centers
Partially operational
148 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage DUB1 Dublin Data Center CampusSite · Connected record
Profile Park, Dublin, County Dublin, Ireland
Vantage Data Centers
Partially operational
52 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage FRA1 Offenbach Data Center CampusSite · Connected record
Offenbach am Main, Hesse, Germany
Vantage Data Centers
Partially operational
56 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage FRA2 Raunheim Data Center CampusSite · Connected record
Raunheim, Hesse, Germany
Vantage Data Centers
Construction
56 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage FrontierSite · Connected record
Texas, United States

Overlapping scope — see profile before aggregating

Vantage Data Centers
Construction
1,400 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage Frontier / Stargate ShackelfordSite · Sourced research
Shackelford County, Texas, United States

Overlapping scope — see profile before aggregating

Vantage Data CentersOracle
Under construction
1,400 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage HKG1 On Lok Data CenterSite · Connected record
Fanling, New Territories, Hong Kong, Hong Kong SAR China
CLP Power Hong KongVantage Data Centers
Operating
5 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage HKG2 Fo Tan Data CenterSite · Connected record
Fo Tan, Hong Kong, Hong Kong SAR China
CLP Power Hong KongVantage Data Centers
Operating
13 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage HKG3 Kwai Chung Data CenterSite · Connected record
Kwai Chung, Hong Kong, Hong Kong SAR China
CLP Power Hong KongVantage Data Centers
Operating
14 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage JHB1 Johor Data Center CampusSite · Connected record
Sedenak, Johor, Malaysia
Abu Dhabi Investment AuthorityGIC
Partially operational
300 MW+
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage JNB1 Johannesburg Data Center CampusSite · Connected record
Midrand, Johannesburg, Gauteng, South Africa
EskomVantage Data Centers
Partially operational
120 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage JNB2 Johannesburg Data CenterSite · Connected record
Isando, Ekurhuleni, Gauteng, South Africa
Municipality of EkurhuleniSolarAfrica
Partially operational
20 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026

Every figure carries its capacity stage. Operating, contracted, planned/design and utility-service values remain distinct; generation is never used as site capacity. A missing figure does not mean zero; other scoped figures may appear in the profile.