Skip to content

AI data center sites

Search sites, programs and supporting energy records by location, company, status or capacity.

1,114 public records · About catalogue coverage

Search property-level records across markets, participants, capacity, development activity, infrastructure and supporting evidence.

1,043 site records69 program records2 energy assets / agreements1,105 detailed profiles9 sourced research records

Record types partition the public catalogue; detailed and sourced-research labels describe those same records, not additional sites. Site records are not a deduplicated count of physical campuses. Overlapping campus, phase or tenant scopes must not be added together.

Clear all filters

Site and program directory

1,043 results · Page 16 of 21
Capacity stages and scopes differ; do not add figures together. How to compare

724 of 1043 matching records have an eligible headline. Select both basis and stage for a like-for-like view. Bounds, physical scope and reporting dates still differ; this is not an additive capacity total.

Project Sail — Coweta CountySite · Connected record
Coweta County, Georgia, United States
Project Sail development team
Permitted
Not establishedIn published records
Project Sail development team
Oct 28, 2026
Project SassySite · Connected record
Rome, Georgia, United States
Atlas Development
Proposed
504 MW
Basis: Basis not specifiedPlanned / design
Atlas Development
Oct 28, 2026
Project Zodiac - Phase 1Site · Connected record
Fort Wayne, Indiana, United States
Google
Operating
1,200 MW
Basis: Basis not specifiedPlanned / design
Google
Oct 28, 2026
Prometheus Hyperscale Evanston Data Center CampusSite · Connected record
Evanston, Wyoming, United States
Prometheus Hyperscale
Permitted
1,250 MW
Basis: Basis not specifiedPlanned / design
Prometheus Hyperscale
Oct 28, 2026
Prometheus WY-2Site · Connected record
Casper, Wyoming, United States
Prometheus Hyperscale
Proposed
1,500 MW
Basis: Basis not specifiedPlanned / design
Prometheus Hyperscale
Oct 28, 2026
Pure DC Amsterdam Westpoort AMS01Site · Connected record
Amsterdam Westpoort, NH, Netherlands
Brookfield Asset ManagementOaktree Capital Management
Construction
78 MW
Basis: Critical ITPlanned critical IT
Pure Data Centres Group
Oct 28, 2026
Pure DC AUH01 Building 1Site · Connected record
Yas Island / Abu Dhabi, AZ, United Arab Emirates
Laing O'RourkePure Data Centres Group
Operating
20 MW
Basis: Basis not specifiedPlanned / design
Pure Data Centres Group
Oct 28, 2026
Pure DC AUH01 Building 2Site · Connected record
Yas Island / Abu Dhabi, AZ, United Arab Emirates
Pure Data Centres Group
Permitted
Not establishedIn published records
Pure Data Centres Group
Oct 28, 2026
Pure DC AUH01 Yas Island CampusSite · Connected record
Yas Island / Abu Dhabi, AZ, United Arab Emirates
Oaktree Capital ManagementPure Data Centres Group
Partially operational
48 MW
Basis: Basis not specifiedPlanned / design
Oaktree Capital Management
Oct 28, 2026
Pure DC DUB01Site · Connected record
Ballycoolin, Dublin 15, Ireland
Pure Data Centres Group
Operating
Not establishedIn published records
Pure Data Centres Group
Oct 28, 2026
Pure DC Dublin Ballycoolin CampusSite · Connected record
Ballycoolin, Dublin 15, Ireland
ABN AMROAllianz Global Investors
Partially operational
Not establishedIn published records
ABN AMRO
Oct 28, 2026
Pure DC SJK01 Seinäjoki AI CampusSite · Connected record
Seinäjoki / Kivenneva, Finland
Pure Data Centres GroupSDC Ventures
Construction
550 MW
Basis: Basis not specifiedPlanned / design
SDC Ventures
Oct 28, 2026
QLevr Inver Grove Heights Data CenterSite · Connected record
5890 Carmen Avenue, Inver Grove Heights, Minnesota, United States
Bolton & MenkCity of Inver Grove Heights
Delayed
5 MW
Basis: Basis not specifiedPlanned / design
QLevr LLC
Oct 28, 2026
QScale Q01 Building ASite · Connected record
Lévis, Quebec, Canada
Hewlett Packard EnterpriseQScale
Partially operational
Not establishedIn published records
QScale
Oct 28, 2026
QScale Q01 Building BSite · Connected record
Lévis, Quebec, Canada
QScale
Construction
60 MW
Basis: Critical ITPlanned critical IT
QScale
Oct 28, 2026
QScale Q01 CampusSite · Connected record
Lévis / Québec City area, Quebec, Canada
Aligned Data CentersGoldman Sachs Alternatives
Partially operational
142 MW
Basis: Basis not specifiedPlanned / design
Goldman Sachs Alternatives
Oct 28, 2026
QTS ASH-MORAN Ashburn Moran Data CenterSite · Connected record
Ashburn, Virginia, United States
QTS Data Centers
Partially operational
4 MW
Basis: Critical ITPlanned critical IT
QTS Data Centers
Oct 28, 2026
QTS ASH1 Ashburn Data Center CampusSite · Connected record
Ashburn, Virginia, United States
QTS Data Centers
Partially operational
55 MW
Basis: Critical ITPlanned critical IT
QTS Data Centers
Oct 28, 2026
QTS ASH2 Ashburn Data Center CampusSite · Connected record
Ashburn, Virginia, United States
QTS Data Centers
Partially operational
75 MW
Basis: Critical ITPlanned critical IT
QTS Data Centers
Oct 28, 2026
QTS ASH3 Ashburn Data Center CampusSite · Connected record
Ashburn, Virginia, United States
QTS Data Centers
Partially operational
80 MW
Basis: Critical ITPlanned critical IT
QTS Data Centers
Oct 28, 2026
QTS ATL1 Atlanta Data Center CampusSite · Connected record
Atlanta, Georgia, United States
QTS Data Centers
Partially operational
278 MW
Basis: Critical ITPlanned critical IT
QTS Data Centers
Oct 28, 2026
QTS ATL2 EastSite · Connected record
West of Veterans Parkway, Fayetteville, Georgia, United States
Georgia PowerQTS Data Centers
Preconstruction
Not establishedIn published records
QTS Data Centers
Oct 28, 2026
QTS Big Cedar Industrial CenterSite · Connected record
Cedar Rapids, Iowa, United States
QTS Data Centers
Preconstruction
616 MW
Basis: Basis not specifiedPlanned / design
QTS Data Centers
Oct 28, 2026
QTS Cambois Data Centre CampusSite · Connected record
Cambois / Blyth, England, United Kingdom
CorganNorthumberland County Council
Construction
720 MW
Basis: Critical ITPlanned critical IT
QTS Data Centers
Oct 28, 2026
QTS Chicago Data Center CampusSite · Connected record
Chicago, Illinois, United States
QTS Data Centers
Partially operational
95 MW
Basis: Critical ITPlanned critical IT
QTS Data Centers
Oct 28, 2026
QTS COS Colorado Springs Data CenterSite · Connected record
Colorado Springs, Colorado, United States
QTS Data Centers
Partially operational
14 MW
Basis: Critical ITPlanned critical IT
QTS Data Centers
Oct 28, 2026
QTS Denver Data Center CampusSite · Connected record
Aurora, Colorado, United States
QTS Data Centers
Construction
160 MW
Basis: Critical ITPlanned critical IT
QTS Data Centers
Oct 28, 2026
QTS DFW1 Irving Data Center CampusSite · Connected record
Irving, Texas, United States
QTS Data Centers
Partially operational
165 MW
Basis: Critical ITPlanned critical IT
QTS Data Centers
Oct 28, 2026
QTS East Windsor Data Center CampusSite · Connected record
East Windsor, New Jersey, United States
QTS Data Centers
Partially operational
70 MW
Basis: Critical ITPlanned critical IT
QTS Data Centers
Oct 28, 2026
QTS EEM Netherlands–Eemshaven Data CenterSite · Connected record
Eemshaven, Groningen, Netherlands
QTS Data Centers
Partially operational
20 MW
Basis: Critical ITPlanned critical IT
QTS Data Centers
Oct 28, 2026
QTS Fayetteville Campus (Project Excalibur)Site · Connected record
Highway 54 West / Veterans Parkway / Tyrone Road, Georgia, United States
Fayette County, GeorgiaMicrosoft
Partially operational
Not establishedIn published records
QTS Data Centers
Oct 28, 2026
QTS Fort Worth Data Center CampusSite · Connected record
Fort Worth, Texas, United States
QTS Data Centers
Partially operational
70 MW
Basis: Critical ITPlanned critical IT
QTS Data Centers
Oct 28, 2026
QTS GRO Groningen Data CenterSite · Connected record
Groningen, Netherlands
QTS Data Centers
Partially operational
4 MW
Basis: Critical ITPlanned critical IT
QTS Data Centers
Oct 28, 2026
QTS HIL1 Hillsboro 1 Data CenterSite · Connected record
Hillsboro, Oregon, United States
QTS Data Centers
Partially operational
20 MW
Basis: Critical ITPlanned critical IT
QTS Data Centers
Oct 28, 2026
QTS HIL2 Hillsboro Data Center CampusSite · Connected record
Hillsboro, Oregon, United States
Portland General ElectricQTS Data Centers
Partially operational
250 MW
Basis: Basis not specifiedContracted
QTS Data Centers
Oct 28, 2026
QTS MAN1 Manassas Data Center CampusSite · Connected record
Manassas, Virginia, United States
QTS Data Centers
Partially operational
190 MW
Basis: Critical ITPlanned critical IT
QTS Data Centers
Oct 28, 2026
QTS MIA Miami Data CenterSite · Connected record
Miami, Florida, United States
QTS Data Centers
Partially operational
2 MW
Basis: Critical ITPlanned critical IT
QTS Data Centers
Oct 28, 2026
QTS Phoenix 3 CampusSite · Connected record
Glendale, Arizona, United States
QTS Data Centers
Preconstruction
750 MW
Basis: Basis not specifiedPlanned / design
QTS Data Centers
Oct 28, 2026
QTS Phoenix DC1 40th Street Data Center CampusSite · Connected record
Phoenix, Arizona, United States
QTS Data Centers
Partially operational
280 MW+
Basis: Basis not specifiedPlanned / design
QTS Data Centers
Oct 28, 2026
QTS Piscataway Data Center CampusSite · Connected record
Piscataway, New Jersey, United States
QTS Data Centers
Partially operational
65 MW
Basis: Critical ITPlanned critical IT
QTS Data Centers
Oct 28, 2026
QTS Prince William Digital Gateway CampusSite · Connected record
Gainesville, Virginia, United States
GW Acquisition Co. LLC / GW Acquisition I LLCQTS Data Centers
Status under review
Not establishedIn published records
GW Acquisition Co. LLC / GW Acquisition I LLC
Oct 28, 2026
QTS RIC1 Richmond Data Center CampusSite · Connected record
Sandston, Virginia, United States
Dominion Energy VirginiaQTS Data Centers
Partially operational
240 MW
Basis: Critical ITPlanned critical IT
QTS Data Centers
Oct 28, 2026
QTS SAC Sacramento Data CenterSite · Connected record
Sacramento, California, United States
QTS Data Centers
Partially operational
4 MW
Basis: Critical ITPlanned critical IT
QTS Data Centers
Oct 28, 2026
QTS SAT2 San Antonio Data Center CampusSite · Connected record
San Antonio, Texas, United States
QTS Data Centers
Partially operational
90 MW
Basis: Critical ITPlanned critical IT
QTS Data Centers
Oct 28, 2026
QTS SCL Santa Clara Data CenterSite · Connected record
Santa Clara, California, United States
QTS Data Centers
Partially operational
7.5 MW
Basis: Critical ITPlanned critical IT
QTS Data Centers
Oct 28, 2026
QTS SUW1 Suwanee Data Center CampusSite · Connected record
Suwanee, Georgia, United States
QTS Data Centers
Partially operational
50 MW
Basis: Critical ITPlanned critical IT
QTS Data Centers
Oct 28, 2026
QTS Van Wert Data Center CampusSite · Connected record
Van Wert, Ohio, United States
QTS Data Centers
Proposed
500 MW
Basis: Basis not specifiedPlanned / design
QTS Data Centers
Oct 28, 2026
QTS–Lancium Hall County CampusSite · Connected record
Turkey, Texas, United States
City of Turkey, TexasElectric Reliability Council of Texas
Status under review
Not establishedIn published records
QTS Data Centers
Oct 28, 2026
Quantica Big Sky Digital CampusSite · Connected record
Broadview, Montana, United States
Quantica Infrastructure
Proposed
Not establishedIn published records
Quantica Infrastructure
Oct 28, 2026
Quantum Loophole Frederick CampusSite · Connected record
Adamstown, Maryland, United States
Quantum Loophole
Preconstruction
2,800 MW
Basis: Basis not specifiedPlanned / design
Quantum Loophole
Oct 28, 2026

Every figure carries its capacity stage. Operating, contracted, planned/design and utility-service values remain distinct; generation is never used as site capacity. A missing figure does not mean zero; other scoped figures may appear in the profile.