QTS ATL1 Atlanta Data Center Campus

Atlanta, Georgia, United StatesPartially operational
Evidence
Planned critical IT
278 MW
Updated
Oct 28, 2026

QTS ATL1 Atlanta Data Center Campus, also known as QTS Atlanta 1, is a partially operational data center campus in Atlanta, GA, US associated with QTS Data Centers. 99-acre QTS location; 278 MW+ published campus capacity.

Capacity

Reported capacity

Design

278 MW

Source

Reported capacity

Planned / design or future potential

278 MW

Source

Campus critical capacity

Planned / design or future potential

278+ MW

Source

Dc1 critical capacity

Planned / design or future potential

70+ MW

Source

Reported capacity

Planned / design or future potential

278 MW

Source

Reported capacity

Planned / design or future potential

278 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionOperational

278 MW is the operator-published facility or campus design boundary.

Operating facility and documented expansionPartially operational

278 MW is the operator-published facility or campus IT design boundary.

Participants

QTS Data Centers

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

QTS Atlanta 1 | Atlanta | GA | US

Source

Location context

Actual

QTS Atlanta 1 | Atlanta | GA | US

Source

Site area

Actual

95+ acres

Source

Dc1 building area

Actual

990,000 square feet

Source

Location context

Actual

QTS Atlanta 1 location | Atlanta | GA | United States

Source

Location context

Actual

Atlanta, GA, US

Source

Development detail

Actual

99-Acre QTS location; 278 MW+ published campus capacity.

Source

Additional project facts

Lifecycle status

Actual

Operational

Source

Capacity basis

Actual

QTS Data Centers publishes 278 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Operating

Source

Capacity basis

Actual

278 MW facility or campus design capacity.

Source

Dedicated substations

Actual

3 substations

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

278 MW facility or campus IT design capacity.

Source

Project identity

Actual

QTS Atlanta 1

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

278 MW facility or campus IT design capacity.

Source

Infrastructure & permits

Technical details (4)
Electric grid

Energized

Three dedicated expandable onsite substations, redundant campus fiber conduit, water-side economization and chilled-water storage.

Fiber

Energized

QTS campus conduit and carrier access are documented in current portfolio and compliance materials.

Electric grid

Energized

QTS campus designed and operated for large-scale data center deployments; project-specific utility details require separate sourcing.

Cooling system

Operational

Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (4)
Switch Atlanta Keep Campus

Partially operational · Atlanta, Georgia, United States

Same locality: Atlanta

Compare in a collection
QTS ATL2 East

Preconstruction · West of Veterans Parkway, Fayetteville, Georgia, United States

Shared participant: QTS Data Centers · Same market: Georgia, United States

Compare in a collection
QTS Fayetteville Campus (Project Excalibur)

Partially operational · Highway 54 West / Veterans Parkway / Tyrone Road, Georgia, United States

Shared participant: QTS Data Centers · Same market: Georgia, United States

Compare in a collection
QTS SUW1 Suwanee Data Center Campus

Partially operational · Suwanee, Georgia, United States

Shared participant: QTS Data Centers · Same market: Georgia, United States

Compare in a collection