QTS EEM Netherlands–Eemshaven Data Center

Eemshaven, Groningen, NetherlandsPartially operational
Capacity
20 MW
Planned critical IT
Lead participant
QTS Data Centers
Developer
Last updated
Aug 28, 2026
Most recent public record update

About QTS EEM Netherlands–Eemshaven Data Center

QTS Eemshaven remains an operating Netherlands facility and is still in QTS’s portfolio following the 2023 acquisition of local operator Zentrys. The legacy 20 MW boundary is kept separate from later hyperscale expansion: Groningen province issued a current permit at Kwelderweg, but that decision does not prove the existing building’s operating IT changed. The 2019 $44 million purchase price covered both Eemshaven and Groningen and is not allocated to this profile. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.

Projects sharing a market, utility, or organization.

2 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load20 MWDesign · QTS EEM Netherlands–Eemshaven Data Center
Design20 MWDesign · QTS EEM Netherlands–Eemshaven Data Center

Development

1 phases · 3 milestones
Operating facility and documented expansionOperational

QTS Eemshaven remains an operating Netherlands facility and is still in QTS’s portfolio following the 2023 acquisition of local operator Zentrys. The legacy 20 MW boundary is kept separate from later hyperscale expansion: Groningen province issued a current permit at Kwelderweg, but that decision does not prove the existing building’s operating IT changed. The 2019 $44 million purchase price covered both Eemshaven and Groningen and is not allocated to this profile. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.

Apr 30, 2019
QTS acquired Eemshaven and Groningen operating assets
Completed
Jan 30, 2026
Province issued a current QTS Eemshaven development permit
Completed
Aug 29, 2026
Project-specific evidence refreshed and reconciled
Completed

Infrastructure

Electric GridOperational

20 MW

20 MW is the operator-published facility design or maximum power boundary; it is not measured tenant utilization.

FiberOperational

European facility with resilient power, carrier connectivity, cooling and physical security infrastructure.

Cooling SystemOperational

Cooling and resilience architecture is described at facility or campus level; instantaneous draw and tenant utilization remain undisclosed.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Cooling & water: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

19 facts
Location Context
QTS Netherlands–Eemshaven | Eemshaven | Groningen | NL
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
20 MW
Design
Capacity Basis
QTS Data Centers publishes 20 MW of critical IT capacity for this record boundary.
Actual
Location Context
QTS Netherlands–Eemshaven | Eemshaven | Groningen | NL
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
20 MW
Design
Capacity Basis
20 MW is the operator published facility design or maximum power boundary; it is not measured tenant utilization.
Actual
Operator Or Developer
QTS Data Centers
Actual
Project Location
Eemshaven, Groningen, NL
Actual
Current Lifecycle
Operating or in phased operation
Actual
Capacity Classification
Design
Actual
Capacity Basis
20 MW is the operator published facility design or maximum power boundary; it is not measured tenant utilization.
Actual
Customer Utilization
Not publicly disclosed
Actual
Source Refresh Date
2026-08-29
Actual
Current Portfolio Presence
Confirmed in QTS current portfolio
Actual
Facility Compliance Scope
Current QTS compliance matrix reviewed
Actual
Two Asset Acquisition Price
$44,000,000
Transaction Scope
Anticipated Recommissioning Capex
$15,000,000
Transaction Scope