Evidence
Planned critical IT
20 MW
Updated
Oct 28, 2026

QTS’s current Eemshaven page identifies DC1 as fully operational, DC2 as being delivered in phases, and DC3 as under construction. The 200 MW campus figure is planned gross power delivered in phases, not operating IT capacity. QTS Eemshaven remains an operating Netherlands facility and is still in QTS’s portfolio following the 2023 acquisition of local operator Zentrys. The legacy 20 MW boundary is kept separate from later hyperscale expansion: Groningen province issued a current permit at Kwelderweg, but that decision does not prove the existing building’s operating IT changed. The 2019 $44 million purchase price covered both Eemshaven and Groningen and is not allocated to this profile. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.

Capacity

Reported capacity

Design

20 MW

Source

Reported capacity

Planned / design or future potential

20 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionOperational

QTS Eemshaven remains an operating Netherlands facility and is still in QTS’s portfolio following the 2023 acquisition of local operator Zentrys. The legacy 20 MW boundary is kept separate from later hyperscale expansion: Groningen province issued a current permit at Kwelderweg, but that decision does not prove the existing building’s operating IT changed. The 2019 $44 million purchase price covered both Eemshaven and Groningen and is not allocated to this profile. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.

Milestones (3)
QTS acquired Eemshaven and Groningen operating assets

Apr 30, 2019 · Recorded actual event

Completed · Land acquired

Source not linked
Province issued a current QTS Eemshaven development permit

Jan 30, 2026 · Recorded actual event

Completed · Permit approved

Source not linked
Project-specific evidence refreshed and reconciled

Aug 29, 2026 · Recorded actual event

Completed · Status changed

Source not linked

Participants

QTS Data Centers

Developer

Sources by role
Developer (1)

Capital & incentives

Capital claims and financing records may overlap. Their amounts are not added together.

Capital claims

Two asset acquisition price

Transaction scope

$44,000,000

Source

Anticipated recommissioning capex

Transaction scope

$15,000,000

Source

Financing records

Equity investment

$44m

Apr 30, 2019

Combined Eemshaven and Groningen acquisition price including closing costs; not a standalone EEM facility valuation.

Parties & sources

QTS Data Centers (Borrower)

Site & development

Location context

Actual

QTS Netherlands–Eemshaven | Eemshaven | Groningen | NL

Source

Location context

Actual

QTS Netherlands–Eemshaven | Eemshaven | Groningen | NL

Source

Project location

Actual

Eemshaven, Groningen, NL

Source

Additional project facts

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

QTS Data Centers publishes 20 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

20 MW is the operator published facility design or maximum power boundary; it is not measured tenant utilization.

Source

Operator or developer

Actual

QTS Data Centers

Source

Current lifecycle

Actual

Operating or in phased operation

Source

Capacity classification

Actual

Design

Source

Capacity basis

Actual

20 MW is the operator published facility design or maximum power boundary; it is not measured tenant utilization.

Source

Customer utilization

Actual

Not publicly disclosed

Source

Source refresh date

Actual

2026-08-29

Source

Current portfolio presence

Actual

Confirmed in QTS current portfolio

Source

Facility compliance scope

Actual

Current QTS compliance matrix reviewed

Source

Infrastructure & permits

Technical details (3)
Electric grid

Operational

20 MW

20 MW is the operator-published facility design or maximum power boundary; it is not measured tenant utilization.

Fiber

Operational

European facility with resilient power, carrier connectivity, cooling and physical security infrastructure.

Cooling system

Operational

Cooling and resilience architecture is described at facility or campus level; instantaneous draw and tenant utilization remain undisclosed.

Other · Issued

QTS Eemshaven expansion, Kwelderweg

Province of Groningen

Jan 30, 2026

Sources (1)

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (2)
Google Eemshaven Data Center Campus

Operating · Eemshaven, Groningen, Netherlands

Same locality: Eemshaven

Compare in a collection
QTS GRO Groningen Data Center

Partially operational · Groningen, Netherlands

Shared participant: QTS Data Centers · Same market: Groningen, Netherlands

Compare in a collection