Data center siteSite record

QTS HIL2 Hillsboro Data Center Campus

Hillsboro, Oregon, United StatesPartially operational
Capacity
250 MW
Contracted
Lead participant
QTS Data Centers
Developer
Last updated
Aug 28, 2026
Most recent public record update

About QTS HIL2 Hillsboro Data Center Campus

QTS HIL2 Hillsboro Data Center Campus, also known as QTS Hillsboro 2, is a partially operational data center campus in Hillsboro, OR, US associated with QTS Data Centers. 51-acre QTS location; 180 MW+ published campus capacity.

Projects sharing a market, utility, or organization.

2 related

Capacity

Contracted
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load180 MWDesign · QTS HIL2 Hillsboro Data Center Campus
Design180 MWDesign · QTS HIL2 Hillsboro Data Center Campus
Design180 MWDesign · QTS HIL2 Hillsboro Data Center Campus
Contracted Supply250 MWActual · QTS HIL2 Hillsboro Data Center Campus
Design180 MWDesign · QTS HIL2 Hillsboro Data Center Campus

Development

2 phases · 3 milestones
Operating facility and documented expansionPartially Operational

180 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Operating facility and documented expansionPartially Operational

180 MW is the operator-published facility or campus IT design boundary. It is not measured tenant utilization or live IT draw.

Apr 1, 2018
Buildings 1 and 2 received development review approval
Completed
Jun 1, 2021
Buildings 3 through 5 received development review approval
Completed
Aug 28, 2026
Current source record reviewed for QTS Hillsboro 2
Completed

Infrastructure

Electric GridEnergized

Pacific Northwest hyperscale campus with expandable power, resilient cooling and diverse fiber connectivity.

FiberEnergized

QTS campus conduit and carrier access are documented in current portfolio and compliance materials.

Electric GridEnergized

QTS campus designed and operated for large-scale data center deployments; project-specific utility details require separate sourcing.

Cooling SystemOperational

Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.

Renewable Energy SupplySecured Or Contracted

250 MW

PGE renewable-resource program for QTS load; not IT design or operating utilization.

Project map

0 of 1 project point mapped
Infrastructure facts
5
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 3Cooling & water: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

20 facts
Location Context
QTS Hillsboro 2 | Hillsboro | OR | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
180 MW
Design
Capacity Basis
QTS Data Centers publishes 180 MW of critical IT capacity for this record boundary.
Actual
Location Context
QTS Hillsboro 2 | Hillsboro | OR | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
180 MW
Design
Capacity Basis
180 MW facility or campus design capacity.
Actual
Project Boundary
QTS Hillsboro 2
Actual
Location Context
Hillsboro, OR, US
Actual
Lifecycle Status
Partially operational
Actual
Capacity Basis
180 MW facility or campus design capacity.
Actual
Location Context
QTS Hillsboro 2 location | Hillsboro | OR | United States
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
180 MW
Design
Capacity Basis
180 MW facility or campus IT design capacity.
Actual
Planned Buildings
5
Forecast
Site Area
51 acres
Actual
Renewable Supply Program
250 MW
Actual
Published It Design
180 MW
Design