QTS HIL1 Hillsboro 1 Data Center
Partially operational · Hillsboro, Oregon, United States
QTS HIL2 Hillsboro Data Center Campus, also known as QTS Hillsboro 2, is a partially operational data center campus in Hillsboro, OR, US associated with QTS Data Centers. 51-acre QTS location; 180 MW+ published campus capacity.
Projects sharing a market, utility, or organization.
Partially operational · Hillsboro, Oregon, United States
Partially operational · Hillsboro, Oregon, United States
180 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.
180 MW is the operator-published facility or campus IT design boundary. It is not measured tenant utilization or live IT draw.
Pacific Northwest hyperscale campus with expandable power, resilient cooling and diverse fiber connectivity.
QTS campus conduit and carrier access are documented in current portfolio and compliance materials.
QTS campus designed and operated for large-scale data center deployments; project-specific utility details require separate sourcing.
Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.
250 MW
PGE renewable-resource program for QTS load; not IT design or operating utilization.
No map point available
Published claims and their source links.