QTS SAT2 San Antonio Data Center Campus
Partially operational · San Antonio, Texas, United States
QTS–Lancium Hall County Campus — Lancium-owned Clean Campus near Turkey with QTS-designed, built and operated data center buildings; separate from Lancium Abilene, Lancium Childress and IREN Childress. Participants include Lancium LLC as owner, QTS Data Centers as developer, QTS Data Centers as operator, Electric Reliability Council of Texas as grid operator. Published specifications include 1000 MW grid or utility service. Development comprises Master planning and permitting (planned), Up-to-11-building buildout (planned). Key milestones include QTS and Lancium announced Hall County campus. (2026-07-13) and Texas ordered audit/pause for new data center grid approvals. (2026-08-04). grid interconnection — 1000 MW: Secondary source reports a 1-GW grid connection; primary interconnection evidence outstanding. behind the meter solar: Solar resources planned; scale and ownership structure undisclosed. Permitting includes air permit for QTS Hall County campus (anticipated unfiled agency text conflict). Incentives include property tax abatement (approved reported) for Lancium Turkey Clean Campus agreements described as ten annual phases and approximately USD20 billion; QTS-specific qualified-property coverage unresolved.
Projects sharing a market, utility, or organization.
Partially operational · San Antonio, Texas, United States
Partially operational · Irving, Texas, United States
Partially operational · Fort Worth, Texas, United States
Partially operational · Denton, Texas, United States
No additional capacity claims are published.
No construction/start date; grid-audit applicability unresolved.
Master-plan envelope, not committed simultaneous construction.
11 buildings
1,000 MW
Secondary source reports a 1-GW grid connection; primary interconnection evidence outstanding.
Solar resources planned; scale and ownership structure undisclosed.
Battery resources planned; power and duration undisclosed.
No ongoing cooling-water consumption after initial charge per company design statement.
No map point available
Published claims and their source links.