QTS–Lancium Hall County Campus

Turkey, Texas, United StatesStatus Under Review
Capacity
No public figure
Lead participant
QTS Data Centers
Developer · Operator
Last updated
Aug 25, 2026
Most recent public record update

About QTS–Lancium Hall County Campus

QTS–Lancium Hall County Campus — Lancium-owned Clean Campus near Turkey with QTS-designed, built and operated data center buildings; separate from Lancium Abilene, Lancium Childress and IREN Childress. Participants include Lancium LLC as owner, QTS Data Centers as developer, QTS Data Centers as operator, Electric Reliability Council of Texas as grid operator. Published specifications include 1000 MW grid or utility service. Development comprises Master planning and permitting (planned), Up-to-11-building buildout (planned). Key milestones include QTS and Lancium announced Hall County campus. (2026-07-13) and Texas ordered audit/pause for new data center grid approvals. (2026-08-04). grid interconnection — 1000 MW: Secondary source reports a 1-GW grid connection; primary interconnection evidence outstanding. behind the meter solar: Solar resources planned; scale and ownership structure undisclosed. Permitting includes air permit for QTS Hall County campus (anticipated unfiled agency text conflict). Incentives include property tax abatement (approved reported) for Lancium Turkey Clean Campus agreements described as ten annual phases and approximately USD20 billion; QTS-specific qualified-property coverage unresolved.

Projects sharing a market, utility, or organization.

4 related

Capacity

Operating capacityAn operating IT-capacity figure has not been publicly disclosed.

No additional capacity claims are published.

Development

2 phases · 4 milestones
Master planning and permittingPlanned

No construction/start date; grid-audit applicability unresolved.

Up-to-11-building buildoutPlanned

Master-plan envelope, not committed simultaneous construction.

11 buildings

May 12, 2025
Hall County advanced reinvestment zone and abatement framework
Completed
Jun 9, 2025
Hall County considered/approved phased Lancium abatements
Completed
Jul 13, 2026
QTS and Lancium announced Hall County campus
Completed
Aug 4, 2026
Texas ordered audit/pause for new data center grid approvals
Completed

Infrastructure

Electric GridReported Context

1,000 MW

Secondary source reports a 1-GW grid connection; primary interconnection evidence outstanding.

SolarPlanned Or Represented

Solar resources planned; scale and ownership structure undisclosed.

Battery StoragePlanned Or Represented

Battery resources planned; power and duration undisclosed.

Closed Loop CoolingPlanned Or Represented

No ongoing cooling-water consumption after initial charge per company design statement.

Project map

0 of 1 project point mapped
Infrastructure facts
4
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 2Generation & storage: 1Cooling & water: 1

Facts & sources

Published claims and their source links.

10 facts
Planned Building Count
11
Fact
Site Area
465 acres
Fact
Investment
$10 billion
Fact
Construction Jobs Peak
7,000 jobs
Fact
Construction Jobs Peak
6,000 jobs
Fact
Permanent Jobs
350 jobs
Fact
Energy Infrastructure Cost Allocation
100% Developer funded
Fact
Cooling Design
Closed loop; no ongoing cooling water consumption after charge
Fact
Water Source
Onsite wells or approved external sources; not Turkey municipal system
Fact
Abatement Agreement Scope
$20 billion
Fact