Site · Multiple connections
Pure DC AUH01 Building 2
Entitled / Permitted · Yas Island / Abu Dhabi, AZ, United Arab Emirates
Same locality: Yas Island / Abu DhabiShared participant: Pure Data Centres Group
Pure DC AUH01 Building 1 is an operating 20 MW building with four halls. The first hall was handed over in 2025; its customer has not been publicly disclosed.
Projects sharing a market, utility, or organization.
Entitled / Permitted · Yas Island / Abu Dhabi, AZ, United Arab Emirates
First of four halls; customer is undisclosed.
Customer-acceptance dates for halls 2–4 have not been publicly disclosed.
No public infrastructure records are attached.
No map point available
Published claims and their source links.