QTS SAT2 San Antonio Data Center Campus

San Antonio, Texas, United StatesPartially operational
Evidence
Planned critical IT
90 MW
Updated
Oct 28, 2026

QTS SAT2 San Antonio Data Center Campus, also known as QTS San Antonio, is a partially operational data center campus in San Antonio, TX, US associated with QTS Data Centers. 32-acre QTS location; 90 MW+ published campus capacity.

Capacity

Reported capacity

Design

90 MW

Source

Reported capacity

Planned / design or future potential

90 MW

Source

Reported capacity

Planned / design or future potential

90 MW

Source

Reported capacity

Planned / design or future potential

90 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionOperational

90 MW is the operator-published facility or campus design boundary.

Operating facility and documented expansionPartially operational

90 MW is the operator-published facility or campus IT design boundary.

Participants

QTS Data Centers

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

QTS San Antonio | San Antonio | TX | US

Source

Location context

Actual

QTS San Antonio | San Antonio | TX | US

Source

Location context

Actual

San Antonio, TX, US

Source

Location context

Actual

QTS San Antonio location | San Antonio | TX | United States

Source

Location context

Actual

San Antonio, TX, US

Source

Development detail

Actual

32-Acre QTS location; 90 MW+ published campus capacity.

Source

Additional project facts

Lifecycle status

Actual

Operational

Source

Capacity basis

Actual

QTS Data Centers publishes 90 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Operating

Source

Capacity basis

Actual

90 MW facility or campus design capacity.

Source

Project boundary

Actual

QTS San Antonio

Source

Lifecycle status

Actual

Operating

Source

Capacity basis

Actual

90 MW facility or campus design capacity.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

90 MW facility or campus IT design capacity.

Source

Project identity

Actual

QTS San Antonio

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

90 MW facility or campus IT design capacity.

Source

Infrastructure & permits

Technical details (4)
Electric grid

Energized

Purpose-built campus infrastructure with redundant power, cooling, security and operator-managed interconnection services.

Fiber

Energized

QTS campus conduit and carrier access are documented in current portfolio and compliance materials.

Electric grid

Energized

QTS campus designed and operated for large-scale data center deployments; project-specific utility details require separate sourcing.

Cooling system

Operational

Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.

Building · Documented

QTS SAT2-DC1

Texas Department of Licensing and Regulation

Jan 1, 2021

Sources (1)

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (4)
CyrusOne SAT1 San Antonio Data Center

Operating · San Antonio, Texas, United States

Same locality: San Antonio

Compare in a collection
CyrusOne SAT2–SAT4 San Antonio Data Center Campus

Partially operational · San Antonio, Texas, United States

Same locality: San Antonio

Compare in a collection
CyrusOne SAT5–SAT6 San Antonio Data Center Campus

Partially operational · San Antonio, Texas, United States

Same locality: San Antonio

Compare in a collection
Microsoft San Antonio Data Center Campus

Operating · San Antonio, Texas, United States

Same locality: San Antonio

Compare in a collection