Data center siteSite record

Prometheus WY-2

Casper, Wyoming, United StatesProposed
Capacity
1,500 MW
Planned / design
Lead participant
Prometheus Hyperscale
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Prometheus WY-2

Prometheus WY-2 is Prometheus Hyperscale’s proposed Casper-area campus in Wyoming. Developer and state materials describe up to 1.5 GW of IT-ready capacity over multiple phases, backed by onsite natural-gas generation and a carbon-capture partnership, with at least $500 million of initial investment. Wyoming economic-development records also identify the Casper project as certified for the state data center sales-tax exemption. The 1.5 GW figure is future phased capacity, not operating load, and first-power, permits, customer commitments and carbon performance remain prospective.

Projects sharing a market, utility, or organization.

1 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Future Potential1,500 MWDesign · Prometheus WY-2
Future Potential1,500 MWDesign · Prometheus WY-2

Development

1 phases · 2 milestones
Phased campus, generation and carbon-infrastructure developmentAnnounced Or Preconstruction

Prometheus WY-2 is Prometheus Hyperscale’s proposed Casper-area campus in Wyoming. Developer and state materials describe up to 1.5 GW of IT-ready capacity over multiple phases, backed by onsite natural-gas generation and a carbon-capture partnership, with at least $500 million of initial investment. Wyoming economic-development records also identify the Casper project as certified for the state data center sales-tax exemption. The 1.5 GW figure is future phased capacity, not operating load, and first-power, permits, customer commitments and carbon performance remain prospective.

Oct 7, 2025
Energy and carbon-capture partnership announced
Completed
Jan 1, 2026
Initial IT-ready target
Forecast

Infrastructure

Onsite GenerationPlanned Or Represented

1,200 MW

Phased generation concept; not operating IT load.

Site FacilityPlanned Or Represented

Carbon-removal pathway remains to be demonstrated.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Generation & storage: 1Site systems: 1

Facts & sources

Published claims and their source links.

11 facts
Location Context
Prometheus WY-2 | Casper | Wyoming | US
Actual
Lifecycle Status
Proposed
Actual
Reported Capacity
1,500 MW
Design
Capacity Basis
1,500 MW future full build site capacity; not measured operating IT load.
Actual
Location Context
Prometheus WY-2 | Casper | Wyoming | US
Actual
Lifecycle Status
Proposed
Actual
Reported Capacity
1,500 MW
Design
Capacity Basis
Up to 1,500 MW is future phased IT-ready capacity; no operating load is claimed.
Actual
Initial Investment
$500,000,000
Reported Rounded
Carbon Partner
Spiritus / Casper Carbon Capture
Actual
Tax Exemption Certification
Wyoming data center sales tax exemption
Actual