Pure DC Dublin Ballycoolin Campus
- Headline capacity
- Not established in published records
- Updated
- Oct 28, 2026
- Utility
- EirGrid
A June 2026 Ingeteam supplier announcement reproduced by IDRA reports that the Orion Phase 1 battery system at Pure DC’s Dublin campus was commissioned and operating, with 10 MW of power and 20 MWh of storage. This initial battery installation does not establish commissioning of the entire planned 110 MW permanent microgrid. Pure DC's Ballycoolin campus has operated since 2024 and is designed for 54 MW across three data-centre buildings. The first is live, later buildings are permitted, and an onsite microgrid supports phased delivery.
Constituent sites / phases
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
3 buildings
54 MW total across operator-named buildings.
Milestones (1)
May 27, 2026 · Recorded actual event
Completed · Financing
Source not linkedParticipants
Other participants (5)
Additional project facts
Infrastructure & permits
Technical details (1)
Reported context
200 MW thermal
Fuel-input connection, not electrical output or IT capacity.
Project map