Skip to content

QTS SAC Sacramento Data Center

Sacramento, California, United StatesPartially operational
Evidence
Planned critical IT
4 MW
Updated
Oct 28, 2026

QTS SAC Sacramento Data Center, also known as QTS Sacramento, is a data center project in Sacramento, CA, US. QTS lists Sacramento with 4 MW of critical capacity. Northern California facility with resilient power, cooling, connectivity and physical security. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.

Capacity

Reported capacity

Design

4 MW

Source

Reported capacity

Planned / design or future potential

4 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionOperational

QTS SAC Sacramento Data Center, also known as QTS Sacramento, is a data center project in Sacramento, CA, US. QTS lists Sacramento with 4 MW of critical capacity. Northern California facility with resilient power, cooling, connectivity and physical security. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.

Milestones (1)
Project-specific evidence refreshed and reconciled

Aug 29, 2026 · Recorded actual event

Completed · Status changed

Source not linked

Participants

QTS Data Centers

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

QTS Sacramento | Sacramento | CA | US

Source

Location context

Actual

QTS Sacramento | Sacramento | CA | US

Source

Project location

Actual

Sacramento, CA, US

Source

Additional project facts

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

QTS Data Centers publishes 4 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

4 MW is the operator published facility design or maximum power boundary; it is not measured tenant utilization.

Source

Operator or developer

Actual

QTS Data Centers

Source

Current lifecycle

Actual

Operating or in phased operation

Source

Capacity classification

Actual

Design

Source

Capacity basis

Actual

4 MW is the operator published facility design or maximum power boundary; it is not measured tenant utilization.

Source

Customer utilization

Actual

Not publicly disclosed

Source

Source refresh date

Actual

2026-08-29

Source

Current portfolio presence

Actual

Confirmed in QTS current portfolio

Source

Facility compliance scope

Actual

Current QTS compliance matrix reviewed

Source

Infrastructure & permits

Technical details (3)
Electric grid

Operational

4 MW

4 MW is the operator-published facility design or maximum power boundary; it is not measured tenant utilization.

Fiber

Operational

Northern California facility with resilient power, cooling, connectivity and physical security.

Cooling system

Operational

Cooling and resilience architecture is described at facility or campus level; instantaneous draw and tenant utilization remain undisclosed.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (2)
NTT DATA Sacramento Data Center Campus

Partially operational · Sacramento, California, United States

Same locality: Sacramento

Compare in a collection
QTS SCL Santa Clara Data Center

Partially operational · Santa Clara, California, United States

Shared participant: QTS Data Centers · Same market: California, United States

Compare in a collection