QTS SUW1 Suwanee Data Center Campus

Suwanee, Georgia, United StatesPartially operational
Evidence
Planned critical IT
50 MW
Updated
Oct 28, 2026

QTS SUW1 Suwanee Data Center Campus, also known as QTS Suwanee 1, is a partially operational data center campus in Suwanee, GA, US associated with QTS Data Centers. 53-acre QTS location; 50 MW+ published campus capacity.

Capacity

Reported capacity

Design

50 MW

Source

Reported capacity

Planned / design or future potential

50 MW

Source

Reported capacity

Planned / design or future potential

50 MW

Source

Current critical design

Planned / design or future potential

50+ MW

Source

Future marketed potential

Planned / design or future potential

100+ MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionPartially operational

50 MW is the operator-published facility or campus design boundary.

Operating facility and documented expansionPartially operational

50 MW is the operator-published facility or campus IT design boundary.

Participants

QTS Data Centers

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

QTS Suwanee 1 | Suwanee | GA | US

Source

Location context

Actual

QTS Suwanee 1 | Suwanee | GA | US

Source

Location context

Actual

Suwanee, GA, US

Source

Location context

Actual

QTS Suwanee 1 location | Suwanee | GA | United States

Source

Site area

Actual

53 acres

Source

Additional project facts

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

QTS Data Centers publishes 50 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

50 MW facility or campus design capacity.

Source

Project boundary

Actual

QTS Suwanee 1

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

50 MW facility or campus design capacity.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

50 MW facility or campus IT design capacity.

Source

Address

Actual

300 Satellite Boulevard

Source

Infrastructure & permits

Technical details (5)
Electric grid

Energized

Atlanta-region infrastructure with scalable power, diverse connectivity, redundant cooling and multilayer security.

Fiber

Energized

QTS campus conduit and carrier access are documented in current portfolio and compliance materials.

Electric grid

Energized

QTS campus designed and operated for large-scale data center deployments; project-specific utility details require separate sourcing.

Cooling system

Operational

Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.

Onsite generation

Permitted or installed

Georgia EPD permit covers emergency generators; engine ratings are not IT capacity.

Air authorization · Issued

QTS Suwanee

Georgia Environmental Protection Division

Jan 1, 2026

Sources (1)

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (3)
QTS ATL1 Atlanta Data Center Campus

Partially operational · Atlanta, Georgia, United States

Shared participant: QTS Data Centers · Same market: Georgia, United States

Compare in a collection
QTS ATL2 East

Preconstruction · West of Veterans Parkway, Fayetteville, Georgia, United States

Shared participant: QTS Data Centers · Same market: Georgia, United States

Compare in a collection
QTS Fayetteville Campus (Project Excalibur)

Partially operational · Highway 54 West / Veterans Parkway / Tyrone Road, Georgia, United States

Shared participant: QTS Data Centers · Same market: Georgia, United States

Compare in a collection