QTS ATL1 Atlanta Data Center Campus
Partially operational · Atlanta, Georgia, United States
QTS SUW1 Suwanee Data Center Campus, also known as QTS Suwanee 1, is a partially operational data center campus in Suwanee, GA, US associated with QTS Data Centers. 53-acre QTS location; 50 MW+ published campus capacity.
Projects sharing a market, utility, or organization.
Partially operational · Atlanta, Georgia, United States
Preconstruction · West of Veterans Parkway, Fayetteville, Georgia, United States
Partially operational · Highway 54 West / Veterans Parkway / Tyrone Road, Georgia, United States
50 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.
50 MW is the operator-published facility or campus IT design boundary. It is not measured tenant utilization or live IT draw.
Atlanta-region infrastructure with scalable power, diverse connectivity, redundant cooling and multilayer security.
QTS campus conduit and carrier access are documented in current portfolio and compliance materials.
QTS campus designed and operated for large-scale data center deployments; project-specific utility details require separate sourcing.
Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.
Georgia EPD permit covers emergency generators; engine ratings are not IT capacity.
No map point available
Published claims and their source links.