QTS ASH3 Ashburn Data Center Campus

Ashburn, Virginia, United StatesPartially operational
Capacity
80 MW
Planned / design
Lead participant
QTS Data Centers
Developer
Last updated
Aug 28, 2026
Most recent public record update

About QTS ASH3 Ashburn Data Center Campus

QTS ASH3 Ashburn Data Center Campus, also known as QTS Ashburn 3, is a partially operational data center campus in Ashburn, VA, US associated with QTS Data Centers. 25-acre QTS location; 80 MW+ published campus capacity.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load80 MWDesign · QTS ASH3 Ashburn Data Center Campus
Design80 MWDesign · QTS ASH3 Ashburn Data Center Campus
Design80 MWDesign · QTS ASH3 Ashburn Data Center Campus
Design80 MWDesign · QTS ASH3 Ashburn Data Center Campus

Development

2 phases · 3 milestones
Operating facility and documented expansionPartially Operational

80 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Operating facility and documented expansionPartially Operational

80 MW is the operator-published facility or campus IT design boundary. It is not measured tenant utilization or live IT draw.

Aug 27, 2026
Primary project source reviewed for QTS Ashburn 3
Completed
Aug 28, 2026
Current source record reviewed for QTS Ashburn 3
Completed
Aug 30, 2026
Design capacity reviewed without inferring tenant utilization
Completed

Infrastructure

Electric GridEnergized

Northern Virginia campus with dense fiber access, resilient power and scalable cooling systems.

FiberEnergized

QTS campus conduit and carrier access are documented in current portfolio and compliance materials.

Electric GridEnergized

QTS campus designed and operated for large-scale data center deployments; project-specific utility details require separate sourcing.

Cooling SystemOperational

Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.

Project map

0 of 1 project point mapped
Infrastructure facts
4
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 2Cooling & water: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

22 facts
Location Context
QTS Ashburn 3 | Ashburn | VA | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
80 MW
Design
Capacity Basis
QTS Data Centers publishes 80 MW of critical IT capacity for this record boundary.
Actual
Location Context
QTS Ashburn 3 | Ashburn | VA | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
80 MW
Design
Capacity Basis
80 MW facility or campus design capacity.
Actual
Project Boundary
QTS Ashburn 3
Actual
Location Context
Ashburn, VA, US
Actual
Lifecycle Status
Partially operational
Actual
Capacity Basis
80 MW facility or campus design capacity.
Actual
Location Context
QTS Ashburn 3 location | Ashburn | VA | United States
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
80 MW
Design
Capacity Basis
80 MW facility or campus IT design capacity.
Actual
Reported Capacity
80 MW
Design
Project Identity
QTS Ashburn 3
Actual
Location Context
Ashburn, VA, US
Actual
Lifecycle Status
Partially operational
Actual
Development Detail
25-Acre QTS location; 80 MW+ published campus capacity.
Actual
Capacity Basis
80 MW facility or campus IT design capacity.