Skip to content
All records
Data center siteSite record

QLevr Inver Grove Heights Data Center

5890 Carmen Avenue, Inver Grove Heights, Minnesota, United StatesOn hold / Delayed
Capacity
5 MW
Planned / design
Lead participant
QLevr LLC
Developer
Last updated
Aug 26, 2026
Most recent public record update

About QLevr Inver Grove Heights Data Center

QLevr proposes a roughly 55,000-square-foot data center on an approximately 14-acre industrial parcel at 5890 Carmen Avenue in Inver Grove Heights. The city found the project exempt from an environmental assessment worksheet in July 2026, but the major site plan remains unresolved amid a data center moratorium, a proposed project-specific removal and threatened developer litigation.

Projects sharing a market, utility, or organization.

3 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Initial Power3 MWProposal · QLevr Inver Grove Heights Data Center
Future Potential5 MWProposal · QLevr Inver Grove Heights Data Center

Development

3 phases · 9 milestones
Major site plan and environmental reviewAnnounced Or Preconstruction

Current proposal-review phase; no construction or operating phase is created.

1 building

Initial 3 MW buildAnnounced Or Preconstruction

Initial power configuration within the same proposed building.

1 building

Full 5 MW buildAnnounced Or Preconstruction

Full-build proposal only.

1 building

Mar 26, 2026
Developer FAQ published for proposed Carmen Avenue data center
Completed
Apr 7, 2026
Planning Commission considered the major site plan
Completed
Apr 27, 2026
Major site plan presented to City Council
Completed
May 11, 2026
Council initiated data center moratorium process
Completed
Jun 26, 2026
One-year data center moratorium approved 3–2; site-plan vote tabled
Completed
Jul 21, 2026
Third-party consultant recommended EAW petition denial
Completed
Jul 27, 2026
Council found project exempt from EAW
Completed
Aug 10, 2026
Council approved first reading of possible project removal from moratorium and discussed pending lawsuit exposure
In Progress
Aug 24, 2026
Second reading was planned after research cutoff
Forecast

Infrastructure

Utility ServiceReported Context

3 MW initial

Initial proposed electric demand; consultant report relies partly on applicant records.

Utility ServicePlanned Or Represented

5 MW ultimate

Ultimate proposed electric demand; not operating load.

Cooling SystemPotential Or Planned

6 closed loop air cooled chillers

Closed-loop system with one-time fill and limited makeup-water model.

Water SupplyPlanned Or Represented

60,000 gallons

Initial closed-loop fill; not annual consumption.

Water SupplyPlanned Or Represented

70,000 gallons

Full-build closed-loop fill; not annual consumption.

Water SupplyReported Context

196 gallons/day

Model output, not measured use.

Water SupplyReported Context

332 gallons/day

Model output, not measured use.

Site FacilityPotential Or Planned

23 feet wall height

Acoustic wall proposed with modeled 40 dBA/54 dBC maximum receptor noise.

Onsite GenerationPotential Or Planned

Emergency diesel generators are described, but exact count and permit path remain unresolved.

Project map

0 of 1 project point mapped
Infrastructure facts
9
Mapped records
1
Capacity figures
8

No map point available

Power & interconnection: 2Generation & storage: 1Cooling & water: 5Site systems: 1

Facts & sources

Published claims and their source links.

22 facts
Site Area
14 acres approx
Proposal
Building Area
55,000 sq. ft.
Proposal
Site Address
5890 Carmen Avenue
Actual
Initial Power
3 MW
Proposal
Ultimate Power
5 MW
Proposal
Zoning
I-1 Limited Industry
Permitted
Use Permission
Data center permitted subject to Major Site Plan
Permitted
Eaw Petition Signatures
700 signatures more than
Actual
Eaw Determination
Exempt; petition denied
Permitted
Major Site Plan Status
Tabled pending EAW review and later council action
Permitted
Data Center Moratorium Status
Approved for one year; project specific removal ordinance received first reading
Permitted
Moratorium Council Vote
3-2 vote
Actual
Developer Litigation Posture
Pending or threatened lawsuit discussed by council
Permitted
Air Cooled Chiller Count
6 units
Proposal
Initial Cooling Fill
60,000 gallons
Proposal
Full Build Cooling Fill
70,000 gallons
Proposal
Average Water Demand
196 gallons/day
Reported Rounded
Peak Water Demand
332 gallons/day
Reported Rounded
City Water Demand Share
0.01 percent less than
Transaction Scope
Modeled Noise Dba
40 dBA max
Reported Rounded
Modeled Noise Dbc
54 dBC max
Reported Rounded
Acoustic Wall Height
23 feet
Proposal