QTS Piscataway Data Center Campus

Piscataway, New Jersey, United StatesPartially operational
Evidence
Planned critical IT
65 MW
Updated
Oct 28, 2026

QTS Piscataway Data Center Campus, also known as QTS Piscataway, is a partially operational data center campus in Piscataway Township, NJ, US associated with QTS Data Centers. 38-acre QTS location; 65 MW+ published campus capacity.

Capacity

Reported capacity

Design

65 MW

Source

Reported capacity

Planned / design or future potential

65 MW

Source

Reported capacity

Planned / design or future potential

65 MW

Source

Reported capacity

Planned / design or future potential

65 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionPartially operational

65 MW is the operator-published facility or campus design boundary.

Operating facility and documented expansionPartially operational

65 MW is the operator-published facility or campus IT design boundary.

Participants

QTS Data Centers

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

QTS Piscataway | Piscataway | NJ | US

Source

Location context

Actual

QTS Piscataway | Piscataway | NJ | US

Source

Location context

Actual

Piscataway, NJ, US

Source

Location context

Actual

QTS Piscataway location | Piscataway Township | NJ | United States

Source

Location context

Actual

Piscataway Township, NJ, US

Source

Development detail

Actual

38-Acre QTS location; 65 MW+ published campus capacity.

Source

Additional project facts

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

QTS Data Centers publishes 65 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

65 MW facility or campus design capacity.

Source

Project boundary

Actual

QTS Piscataway

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

65 MW facility or campus design capacity.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

65 MW facility or campus IT design capacity.

Source

Project identity

Actual

QTS Piscataway

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

65 MW facility or campus IT design capacity.

Source

Infrastructure & permits

Technical details (4)
Electric grid

Energized

Carrier-connected Northeast campus with resilient power, cooling and operator-managed security.

Fiber

Energized

QTS campus conduit and carrier access are documented in current portfolio and compliance materials.

Electric grid

Energized

QTS campus designed and operated for large-scale data center deployments; project-specific utility details require separate sourcing.

Cooling system

Operational

Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (1)
QTS East Windsor Data Center Campus

Partially operational · East Windsor, New Jersey, United States

Shared participant: QTS Data Centers · Same market: New Jersey, United States