QTS Phoenix 3 Campus

Glendale, Arizona, United StatesPreconstruction
Capacity
750 MW
Planned / design
Lead participant
QTS Data Centers
Developer
Last updated
Aug 30, 2026
Most recent public record update

About QTS Phoenix 3 Campus

QTS Phoenix 3 Campus, also known as QTS Phoenix 3, is a preconstruction data center campus in Glendale, AZ, US associated with QTS Data Centers. QTS location; in development; no project-scoped public MW on the current directory.

Projects sharing a market, utility, or organization.

1 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Future Potential750 MWDesign · QTS Phoenix 3 Campus

Development

2 phases · 3 milestones
In developmentAnnounced Or Preconstruction

QTS Phoenix 3 is an in-development campus in the Glendale/Litchfield Park area of Arizona. QTS publicly lists multiple building addresses, water-free cooling and construction/job commitments, while its older technical sheet described 280+ MW of planned campus capacity; the earlier 750 MW figure remains an external expansion estimate.

Development, permitting and phased deliveryAnnounced Or Preconstruction

No project-specific MW basis was verified in the reviewed public sources. The available public sources do not establish a single project-scoped capacity figure.

Jul 1, 2024
QTS published Phoenix campus technical sheet
Completed
Aug 27, 2026
Primary project source reviewed for QTS Phoenix 3
Completed
Aug 30, 2026
Operating status not inferred from development evidence
Completed

Infrastructure

Cooling SystemPlanned Or Represented

Water-free cooling standard.

Electric GridPlanned Or Represented

280 MW

First-party planned campus figure; 750 MW retained only as secondary ceiling.

Electric GridPlanned Or Represented

QTS campus designed and operated for large-scale data center deployments; project-specific utility details require separate sourcing.

Cooling SystemPlanned Or Represented

Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.

Project map

0 of 1 project point mapped
Infrastructure facts
4
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 2Cooling & water: 2

Facts & sources

Published claims and their source links.

15 facts
Location Context
QTS Phoenix 3 Campus | Glendale | Arizona | US
Actual
Lifecycle Status
Proposed
Actual
Reported Capacity
750 MW
Design
Capacity Basis
750 MW future full build site capacity; not measured operating IT load.
Actual
Listed Buildings
5 addresses
Actual
Cooling System
Water free cooling
Actual
Capacity Status
750 MW is an external expansion estimate, not first party current capacity
Actual
Location Context
QTS Phoenix 3 location | Glendale | AZ | United States
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
Withheld
Proposal
Project Identity
QTS Phoenix 3
Actual
Location Context
Glendale, AZ, US
Actual
Lifecycle Status
Preconstruction
Actual
Development Detail
QTS location; in development; no project scoped public MW on the current directory.
Actual
Capacity Basis
Public materials reviewed for this project do not establish a project specific MW basis suitable for a headline.
Actual