QTS Phoenix 3 Campus

Glendale, Arizona, United StatesPreconstruction
Evidence
Planned / design
750 MW
Updated
Oct 28, 2026

QTS Phoenix 3 Campus, also known as QTS Phoenix 3, is a preconstruction data center campus in Glendale, AZ, US associated with QTS Data Centers. QTS location; in development; no project-scoped public MW on the current directory.

Capacity

Reported capacity

Planned / design or future potential

750 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

In developmentAnnounced or preconstruction

QTS Phoenix 3 is an in-development campus in the Glendale/Litchfield Park area of Arizona. QTS publicly lists multiple building addresses, water-free cooling and construction/job commitments, while its older technical sheet described 280+ MW of planned campus capacity; the earlier 750 MW figure remains an external expansion estimate.

Development, permitting and phased deliveryAnnounced or preconstruction

No project-specific MW basis was verified in the reviewed public sources. The available public sources do not establish a single project-scoped capacity figure.

Milestones (2)
QTS published Phoenix campus technical sheet

Jul 2024 · Recorded actual event

Completed · Capacity revised

Source not linked
Operating status not inferred from development evidence

Aug 30, 2026 · Recorded actual event

Completed · Status changed

Source not linked

Participants

QTS Data Centers

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

QTS Phoenix 3 Campus | Glendale | Arizona | US

Source

Listed buildings

Actual

5 addresses

Source

Location context

Actual

QTS Phoenix 3 location | Glendale | AZ | United States

Source

Location context

Actual

Glendale, AZ, US

Source

Development detail

Actual

QTS location; in development; no project scoped public MW on the current directory.

Source

Technical specifications

Cooling system

Actual

Water free cooling

Source

Additional project facts

Lifecycle status

Actual

Proposed

Source

Capacity basis

Actual

750 MW future full build site capacity; not measured operating IT load.

Source

Capacity status

Actual

750 MW is an external expansion estimate, not first party current capacity

Source

Lifecycle status

Actual

Preconstruction

Source

Reported capacity

Proposal

Withheld

Source

Project identity

Actual

QTS Phoenix 3

Source

Lifecycle status

Actual

Preconstruction

Source

Capacity basis

Actual

Public materials reviewed for this project do not establish a project specific MW basis suitable for a headline.

Source

Infrastructure & permits

Technical details (4)
Cooling system

Planned or represented

Water-free cooling standard.

Electric grid

Planned or represented

280 MW

First-party planned campus figure; 750 MW retained only as secondary ceiling.

Electric grid

Planned or represented

QTS campus designed and operated for large-scale data center deployments; project-specific utility details require separate sourcing.

Cooling system

Planned or represented

Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (1)