Skip to content
All records
Data center siteSite record

QTS HIL1 Hillsboro 1 Data Center

Hillsboro, Oregon, United StatesPartially operational
Capacity
20 MW
Planned / design
Lead participant
QTS Data Centers
Developer
Last updated
Aug 28, 2026
Most recent public record update

About QTS HIL1 Hillsboro 1 Data Center

QTS HIL1 Hillsboro 1 Data Center, also known as QTS Hillsboro 1, is a partially operational data center campus in Hillsboro, OR, US associated with QTS Data Centers. 25-acre QTS location; 20 MW+ published campus capacity.

Projects sharing a market, utility, or organization.

2 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load20 MWDesign · QTS HIL1 Hillsboro 1 Data Center
Design20 MWDesign · QTS HIL1 Hillsboro 1 Data Center
Design20 MWDesign · QTS HIL1 Hillsboro 1 Data Center
Design20 MWDesign · QTS HIL1 Hillsboro 1 Data Center

Development

2 phases · 3 milestones
Operating facility and documented expansionOperational

QTS Hillsboro 1 is the existing DC1 at 4951 NE Huffman Street. Current marketing uses a conservative 20 MW+ critical-power headline on a 25-acre campus, while a 2024 building sheet reports 24 MW and a 200 MW+ wider multi-building campus potential. Cartis keeps 20 MW as the public facility value and records the larger figures only as design context. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.

Operating facility and documented expansionPartially Operational

20 MW is the operator-published facility or campus IT design boundary. It is not measured tenant utilization or live IT draw.

Aug 27, 2026
Primary project source reviewed for QTS Hillsboro 1
Completed
Aug 29, 2026
Project-specific evidence refreshed and reconciled
Completed
Aug 30, 2026
Design capacity reviewed without inferring tenant utilization
Completed

Infrastructure

Electric GridOperational

20 MW

QTS currently markets 20 MW+ for Hillsboro 1, while a 2024 building data sheet reports 24 MW and a 200 MW+ wider campus boundary. The available public sources do not establish a single project-scoped capacity figure.

FiberOperational

Pacific Northwest facility with carrier connectivity, resilient power and scalable cooling systems.

Cooling SystemOperational

Cooling and resilience architecture is described at facility or campus level; instantaneous draw and tenant utilization remain undisclosed.

Electric GridEnergized

QTS campus designed and operated for large-scale data center deployments; project-specific utility details require separate sourcing.

Cooling SystemOperational

Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.

Project map

0 of 1 project point mapped
Infrastructure facts
5
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 2Cooling & water: 2Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

29 facts
Location Context
QTS Hillsboro 1 | Hillsboro | OR | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
20 MW
Design
Capacity Basis
QTS Data Centers publishes 20 MW of critical IT capacity for this record boundary.
Actual
Location Context
QTS Hillsboro 1 | Hillsboro | OR | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
20 MW
Design
Capacity Basis
QTS currently markets 20 MW+ for Hillsboro 1, while a 2024 building data sheet reports 24 MW and a 200 MW+ wider campus boundary.
Actual
Operator Or Developer
QTS Data Centers
Actual
Project Location
Hillsboro, OR, US
Actual
Current Lifecycle
Operating or in phased operation
Actual
Capacity Classification
Design
Actual
Capacity Basis
QTS currently markets 20 MW+ for Hillsboro 1, while a 2024 building data sheet reports 24 MW and a 200 MW+ wider campus boundary.
Actual
Customer Utilization
Not publicly disclosed
Actual
Source Refresh Date
2026-08-29
Actual
Current Portfolio Presence
Confirmed in QTS current portfolio
Actual
Facility Compliance Scope
Current QTS compliance matrix reviewed
Actual
Site Area
25 acres
Actual
Critical Power Current Marketing
20+ MW
Design
Location Context
QTS Hillsboro 1 location | Hillsboro | OR | United States
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
20 MW
Design
Capacity Basis
20 MW facility or campus IT design capacity.
Actual
Reported Capacity
20 MW
Design
Project Identity
QTS Hillsboro 1
Actual
Location Context
Hillsboro, OR, US
Actual
Lifecycle Status
Partially operational
Actual
Development Detail
25-Acre QTS location; 20 MW+ published campus capacity.
Actual
Capacity Basis
20 MW facility or campus IT design capacity.
Actual