QTS HIL1 Hillsboro 1 Data Center
- Planned critical IT
- 20 MW
- Updated
- Oct 28, 2026
QTS HIL1 Hillsboro 1 Data Center, also known as QTS Hillsboro 1, is a partially operational data center campus in Hillsboro, OR, US associated with QTS Data Centers. 25-acre QTS location; 20 MW+ published campus capacity.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
QTS Hillsboro 1 is the existing DC1 at 4951 NE Huffman Street. Current marketing uses a conservative 20 MW+ critical-power headline on a 25-acre campus, while a 2024 building sheet reports 24 MW and a 200 MW+ wider multi-building campus potential. Cartis keeps 20 MW as the public facility value and records the larger figures only as design context. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.
20 MW is the operator-published facility or campus IT design boundary.
Milestones (1)
Aug 29, 2026 · Recorded actual event
Completed · Status changed
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- QTS data center portfolio — Hillsboro 1 · Aug 28, 2026 · Primary
Capital & incentives
Incentives
Property tax abatement
Proposed · City of Hillsboro
Facility data sheet identifies available incentive categories; no project-specific realized award is asserted.
Site & development
Additional project facts
Capacity basis
ActualQTS Data Centers publishes 20 MW of critical IT capacity for this record boundary.
SourceCapacity basis
ActualQTS currently markets 20 MW+ for Hillsboro 1, while a 2024 building data sheet reports 24 MW and a 200 MW+ wider campus boundary.
SourceCapacity basis
ActualQTS currently markets 20 MW+ for Hillsboro 1, while a 2024 building data sheet reports 24 MW and a 200 MW+ wider campus boundary.
SourceInfrastructure & permits
Technical details (5)
Operational
20 MW
QTS currently markets 20 MW+ for Hillsboro 1, while a 2024 building data sheet reports 24 MW and a 200 MW+ wider campus boundary. The available public sources do not establish a single project-scoped capacity figure.
Operational
Pacific Northwest facility with carrier connectivity, resilient power and scalable cooling systems.
Operational
Cooling and resilience architecture is described at facility or campus level; instantaneous draw and tenant utilization remain undisclosed.
Energized
QTS campus designed and operated for large-scale data center deployments; project-specific utility details require separate sourcing.
Operational
Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.
Project map
Air authorization technical review · Issued
QTS HIL1
Oregon Department of Environmental Quality
Aug 30, 2026
Sources (1)
- QTS Hillsboro cleaner-air record · Aug 30, 2026 · Primary
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (4)
Partially operational · Hillsboro, Oregon, United States
Same locality: Hillsboro · Shared participant: QTS Data Centers
Compare in a collectionUnder construction · Hillsboro, Oregon, United States
Same locality: Hillsboro
Compare in a collectionPartially operational · Hillsboro, Oregon, United States
Same locality: Hillsboro
Compare in a collectionPartially operational · Hillsboro, Oregon, United States
Same locality: Hillsboro
Compare in a collection