QTS HIL1 Hillsboro 1 Data Center

Hillsboro, Oregon, United StatesPartially operational
Evidence
Planned critical IT
20 MW
Updated
Oct 28, 2026

QTS HIL1 Hillsboro 1 Data Center, also known as QTS Hillsboro 1, is a partially operational data center campus in Hillsboro, OR, US associated with QTS Data Centers. 25-acre QTS location; 20 MW+ published campus capacity.

Capacity

Reported capacity

Design

20 MW

Source

Reported capacity

Planned / design or future potential

20 MW

Source

Critical power current marketing

Planned / design or future potential

20+ MW

Source

Reported capacity

Planned / design or future potential

20 MW

Source

Reported capacity

Planned / design or future potential

20 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionOperational

QTS Hillsboro 1 is the existing DC1 at 4951 NE Huffman Street. Current marketing uses a conservative 20 MW+ critical-power headline on a 25-acre campus, while a 2024 building sheet reports 24 MW and a 200 MW+ wider multi-building campus potential. Cartis keeps 20 MW as the public facility value and records the larger figures only as design context. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.

Operating facility and documented expansionPartially operational

20 MW is the operator-published facility or campus IT design boundary.

Milestones (1)
Project-specific evidence refreshed and reconciled

Aug 29, 2026 · Recorded actual event

Completed · Status changed

Source not linked

Participants

QTS Data Centers

Developer

Sources by role
Developer (1)

Capital & incentives

Incentives

Property tax abatement

Proposed · City of Hillsboro

Facility data sheet identifies available incentive categories; no project-specific realized award is asserted.

Site & development

Location context

Actual

QTS Hillsboro 1 | Hillsboro | OR | US

Source

Location context

Actual

QTS Hillsboro 1 | Hillsboro | OR | US

Source

Project location

Actual

Hillsboro, OR, US

Source

Site area

Actual

25 acres

Source

Location context

Actual

QTS Hillsboro 1 location | Hillsboro | OR | United States

Source

Location context

Actual

Hillsboro, OR, US

Source

Development detail

Actual

25-Acre QTS location; 20 MW+ published campus capacity.

Source

Additional project facts

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

QTS Data Centers publishes 20 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

QTS currently markets 20 MW+ for Hillsboro 1, while a 2024 building data sheet reports 24 MW and a 200 MW+ wider campus boundary.

Source

Operator or developer

Actual

QTS Data Centers

Source

Current lifecycle

Actual

Operating or in phased operation

Source

Capacity classification

Actual

Design

Source

Capacity basis

Actual

QTS currently markets 20 MW+ for Hillsboro 1, while a 2024 building data sheet reports 24 MW and a 200 MW+ wider campus boundary.

Source

Customer utilization

Actual

Not publicly disclosed

Source

Source refresh date

Actual

2026-08-29

Source

Current portfolio presence

Actual

Confirmed in QTS current portfolio

Source

Facility compliance scope

Actual

Current QTS compliance matrix reviewed

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

20 MW facility or campus IT design capacity.

Source

Project identity

Actual

QTS Hillsboro 1

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

20 MW facility or campus IT design capacity.

Source

Infrastructure & permits

Technical details (5)
Electric grid

Operational

20 MW

QTS currently markets 20 MW+ for Hillsboro 1, while a 2024 building data sheet reports 24 MW and a 200 MW+ wider campus boundary. The available public sources do not establish a single project-scoped capacity figure.

Fiber

Operational

Pacific Northwest facility with carrier connectivity, resilient power and scalable cooling systems.

Cooling system

Operational

Cooling and resilience architecture is described at facility or campus level; instantaneous draw and tenant utilization remain undisclosed.

Electric grid

Energized

QTS campus designed and operated for large-scale data center deployments; project-specific utility details require separate sourcing.

Cooling system

Operational

Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.

Air authorization technical review · Issued

QTS HIL1

Oregon Department of Environmental Quality

Aug 30, 2026

Sources (1)

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (4)
QTS HIL2 Hillsboro Data Center Campus

Partially operational · Hillsboro, Oregon, United States

Same locality: Hillsboro · Shared participant: QTS Data Centers

Compare in a collection
Aligned Hillsboro Campus

Under construction · Hillsboro, Oregon, United States

Same locality: Hillsboro

Compare in a collection
NTT Hillsboro Campus

Partially operational · Hillsboro, Oregon, United States

Same locality: Hillsboro

Compare in a collection
STACK Portland Hillsboro Data Center Campus

Partially operational · Hillsboro, Oregon, United States

Same locality: Hillsboro

Compare in a collection