QTS East Windsor Data Center Campus
- Planned critical IT
- 70 MW
- Updated
- Oct 28, 2026
QTS’s current East Windsor plan includes one additional data center and an additional $600 million of planned investment. The operator says future development remains subject to applicable approvals; no opening or incremental MW figure is established. QTS East Windsor Data Center Campus, also known as QTS East Windsor, is a partially operational data center campus in East Windsor, NJ, US associated with QTS Data Centers. 52-acre QTS location; 70 MW+ published campus capacity.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
70 MW is the operator-published facility or campus design boundary.
70 MW is the operator-published facility or campus IT design boundary.
Participants
Developer
Sources by role
Developer (1)
- QTS data center portfolio — East Windsor · Aug 28, 2026 · Primary
Site & development
Additional project facts
Capacity basis
ActualQTS Data Centers publishes 70 MW of critical IT capacity for this record boundary.
SourceInfrastructure & permits
Technical details (4)
Energized
Northeast corridor connectivity with expandable power, resilient cooling and multilayer security.
Energized
QTS campus conduit and carrier access are documented in current portfolio and compliance materials.
Energized
QTS campus designed and operated for large-scale data center deployments; project-specific utility details require separate sourcing.
Operational
Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.