QTS East Windsor Data Center Campus

East Windsor, New Jersey, United StatesPartially operational
Evidence
Planned critical IT
70 MW
Updated
Oct 28, 2026

QTS’s current East Windsor plan includes one additional data center and an additional $600 million of planned investment. The operator says future development remains subject to applicable approvals; no opening or incremental MW figure is established. QTS East Windsor Data Center Campus, also known as QTS East Windsor, is a partially operational data center campus in East Windsor, NJ, US associated with QTS Data Centers. 52-acre QTS location; 70 MW+ published campus capacity.

Capacity

Reported capacity

Design

70 MW

Source

Reported capacity

Planned / design or future potential

70 MW

Source

Reported capacity

Planned / design or future potential

70 MW

Source

Published IT design

Planned / design or future potential

70+ MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionPartially operational

70 MW is the operator-published facility or campus design boundary.

Operating facility and documented expansionPartially operational

70 MW is the operator-published facility or campus IT design boundary.

Participants

QTS Data Centers

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

QTS East Windsor | East Windsor | NJ | US

Source

Location context

Actual

QTS East Windsor | East Windsor | NJ | US

Source

Location context

Actual

East Windsor, NJ, US

Source

Location context

Actual

QTS East Windsor location | East Windsor | NJ | United States

Source

Site area

Actual

52 acres

Source

Onsite solar

Actual

14 MW generation

Source

Additional building

Forecast

Planned

Source

Additional project facts

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

QTS Data Centers publishes 70 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

70 MW facility or campus design capacity.

Source

Project boundary

Actual

QTS East Windsor

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

70 MW facility or campus design capacity.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

70 MW facility or campus IT design capacity.

Source

Infrastructure & permits

Technical details (4)
Electric grid

Energized

Northeast corridor connectivity with expandable power, resilient cooling and multilayer security.

Fiber

Energized

QTS campus conduit and carrier access are documented in current portfolio and compliance materials.

Electric grid

Energized

QTS campus designed and operated for large-scale data center deployments; project-specific utility details require separate sourcing.

Cooling system

Operational

Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (1)
QTS Piscataway Data Center Campus

Partially operational · Piscataway, New Jersey, United States

Shared participant: QTS Data Centers · Same market: New Jersey, United States

Compare in a collection