Skip to content
All records
Data center siteSite record

CyrusOne FRA5 Hanau Data Center Campus

Hanau, HE, GermanyPartially operational
Capacity
54 MW
Planned / design
Lead participant
CyrusOne
Developer
Last updated
Aug 28, 2026
Most recent public record update

About CyrusOne FRA5 Hanau Data Center Campus

CyrusOne FRA5 Hanau Data Center Campus, also known as CyrusOne FRA5, is a partially operational data center campus in Hanau, HE, DE associated with CyrusOne. Two three-story buildings; 18,000 square metres; 54 MW total IT capacity. Frankfurt-region campus with active/active power, dedicated 9 MW data halls and renewable-energy design.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load54 MWDesign · CyrusOne FRA5 Hanau Data Center Campus
Design54 MWDesign · CyrusOne FRA5 Hanau Data Center Campus
Design54 MWDesign · CyrusOne FRA5 Hanau Data Center Campus
Design54 MWDesign · CyrusOne FRA5 Hanau Data Center Campus

Development

2 phases · 4 milestones
Operating facility and documented expansionPartially Operational

54 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Operating facility and documented expansionPartially Operational

54 MW is the operator-published facility or campus IT design boundary. It is not measured tenant utilization or live IT draw.

Aug 1, 2023
City of Hanau presented building permit
Completed
Jun 16, 2026
Emergency-generation modification permit issued
Completed
Aug 27, 2026
Primary project source reviewed for CyrusOne FRA5
Completed
Aug 30, 2026
Design capacity reviewed without inferring tenant utilization
Completed

Infrastructure

Electric GridEnergized

90 MVA active-active supply, dedicated electrical plant and cooling by hall, carrier-neutral fiber and heat-reuse readiness.

Cooling SystemOperational

Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.

Electric GridEnergized

Frankfurt-region campus with active/active power, dedicated 9 MW data halls and renewable-energy design.

Cooling SystemOperational

Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.

Onsite GenerationPermitted Or Installed

Emergency generator thermal input is excluded from IT-capacity claims.

Project map

0 of 1 project point mapped
Infrastructure facts
5
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 2Generation & storage: 1Cooling & water: 2

Facts & sources

Published claims and their source links.

21 facts
Location Context
CyrusOne FRA5 | Hanau | HE | DE
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
54 MW
Design
Capacity Basis
CyrusOne publishes 54 MW of critical IT capacity for this record boundary.
Actual
Location Context
CyrusOne FRA5 | Hanau | HE | DE
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
54 MW
Design
Capacity Basis
54 MW facility or campus design capacity.
Actual
Project Boundary
CyrusOne FRA5
Actual
Location Context
Hanau, HE, DE
Actual
Lifecycle Status
Partially operational
Actual
Development Detail
Two separate three story buildings; 18,000 square metres of technical space; six 9 MW data halls; 54 MW IT capacity.
Actual
Capacity Basis
54 MW facility or campus design capacity.
Actual
Location Context
CyrusOne FRA5 | Hanau | HE | DE
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
54 MW
Design
Capacity Basis
54 MW facility or campus IT design capacity.
Actual
Campus It Design
54 MW
Design
Building Count
2
Actual
Technical Area
18,000 square metres
Design
Backup Generation
Permit controlled; thermal rating excluded from IT
Actual