Google–Intersect Meitner Energy Center

Gray and Roberts Counties, Texas, United StatesUnder construction
Evidence
Headline capacity
Not established in published records
Updated
Oct 28, 2026

Meitner combines a Google data center under construction in Gray County with Intersect's energy development in Gray and Roberts counties. The announced more-than-1-GW wind, solar and battery figure is a mixed energy-portfolio description, not data center IT capacity. Air cooling and majority-clean day-one power are design commitments, not operating results. State records distinguish IP Meitner DTC as registered owner, Google as occupant/operator and IP Meitner Land in building filings. A signed county abatement and pending domestic-wastewater application add regulatory detail, but benefits realized, site-level financing and IT load are not established. Google's Texas-wide investment and the two-center community fund are not Meitner capital.

Capacity

Operational water design scope

Planned / design or future potential

Air cooled design; domestic operational uses, with construction, fire protection and cleaning water permitted scope

Source

Battery power and energy capacity

Battery energy storage

Not separately disclosed in reviewed current project announcements MW / MWh

Energy quantity; not power capacity

Source

Battery storage infrastructure

Battery energy storage

Battery included in >1 GW mixed portfolio; battery MW and MWh not independently disclosed in reviewed current project sources. system

Energy storage capacity; not IT capacity

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Google data center constructionUnder construction
Co-located wind solar and storageUnder construction
On-site gas firmingPlanned

Participants

Google LLC

Occupant operator

Intersect

Developer

IP Meitner DTC LLC

Registered owner — state certification, not independently verified deed title

IP Meitner Land LLC

Building registered owner — Pumpkin building filings, not independently verified deed title

IP Meitner LLC

Agreement party operator

Design LLC

Registered operator

Capital & incentives

Capital claims

Texas Water Fund — non project program

Company program not project capex

$10,000,000

Source

Google Texas investment program — not Meitner capital

Statewide program context

$40,000,000,000

Source

Three county two center community commitment — not Meitner capital

Multi county community program context

$50,000,000

Source

Phase 1 anticipated initial capital cost

Project cost estimate not financing

Approximately $1 billion

Source

Abatement property legal description acreage

Documented internal discrepancy

Printed total 1,744.24; listed parcels sum to 1,742.24 acres

Source

Tax abatement with pilot

Executed not benefit commencement

100% Qualifying property abatement, 10 years per phase. Qualifying county tax property per phase; PILOT phase 1 greater of 25% of real improvement county tax or $425,000; phases 2/3 greater of 20% or $350,000 each. Not net 75%/80% across all personal property. Commencement/conditions and benefits actually realized unverified; effective October 31, 2025. incentive scope

Source

Incentives

Abatement property legal description acreage

Documented internal discrepancy

Printed total 1,744.24; listed parcels sum to 1,742.24

Tax abatement with pilot

Executed not benefit commencement

100% qualifying-property abatement, 10 years per phase. Qualifying county-tax property per phase; PILOT phase 1 greater of 25% of real-improvement county tax or $425,000; phases 2/3 greater of 20% or $350,000 each. Not net 75%/80% across all personal property. Commencement/conditions and benefits actually realized unverified; effective October 31, 2025.

Site & development

Construction announcement

Actual

Jun 4, 2026

Source

Wheeler County offsite workforce hub area

Offsite planned context

800 acres

Source

Wastewater project land control

Applicant representation

Applicant representative reports land purchase scope

Source

Meitner construction announced

Announced

2026-06-04 — Announced milestone

Source

Pumpkin 1 A registered completion estimate

Forecast

2027-11-30 — Forecast milestone

Source

Pumpkin 2 A registered completion estimate

Forecast

2027-12-14 — Forecast milestone

Source

Pumpkin 3 A registered completion estimate

Forecast

2028-04-18 — Forecast milestone

Source

Technical specifications

Co located wind solar and storage mixed energy portfolio capacity — not IT load

Aggregate nameplate context

More than 1 GW

Source

Cooling system

Design

Air cooling planned for completed data center system

Source

Day one clean energy share

Planned

Majority share

Source

Proposed domestic wastewater average daily flow — not water consumption

Proposed permit design

28,700 gallons/day

Source

Onsite generation infrastructure

Planned

Wind and solar with minority share onsite gas firming; aggregate portfolio announcement does not resolve each technology rating. system

Source

Cooling infrastructure

Planned

Air cooled completed data center design; not observed operation. system

Source

Wastewater infrastructure

Application pending

Proposed domestic WWTP evaporation pond disposal with no surface water discharge. Numeric design is wastewater, not water consumption. system

Source

Additional project facts

On site gas share

Planned firming

Minority share

Source

Wheeler County offsite workforce hub accommodation

Offsite planned context

3,500 workers

Source

Data center IT capacity

Unknown

Not disclosed in reviewed current project announcements MW

Source

Gray County agreement effective by last signature

Executed

2025-10-31 — Executed milestone

Source

Google closed Intersect acquisition in March (month only)

Completed; month precision

2026-03 — Completed milestone

Source

Meitner data center state certification effective, not opening

Effective

2026-04-27 — Effective milestone

Source

Two center three county community commitment announced

Announced

2026-10-14 — Announced milestone

Source

IP Meitner DTC WWTP WQ0016867001 permit or registration record

Wastewater land application

Pending; review/notice/registration date 2026-02-13. Technical completeness date, not permit issuance. Proposed wastewater design, not verified construction or actual flow. regulatory record

Source

Pumpkin 1 A TABS2026014814 permit or registration record

Building accessibility registration

Review complete; review/notice/registration date 2026-03-12. Registration is not completed construction. November 30, 2027 forecast; registered owner is distinct from state certification owner. regulatory record

Source

Pumpkin 2 A TABS2026011989 permit or registration record

Building accessibility registration

Registered; review/notice/registration date 2026-02-08. Registration is not completed construction. December 14, 2027 forecast. regulatory record

Source

Pumpkin 3 A TABS2026014835 permit or registration record

Building accessibility registration

Registered; review/notice/registration date 2026-03-12. Registration is not completed construction. April 18, 2028 forecast. regulatory record

Source

Qualifying large data center certification

Certified

Meitner data center certification effective April 27, 2026. No exemption savings quantified. Certification is not commissioning, utilization or proof of realized tax benefits. incentive scope

Source

Project Pumpkin data center identity

Regulatory identity bridge

TCEQ wastewater file explicitly identifies Intersect new data center at Pumpkin site; IP Meitner DTC applicant. Separate from Roman and Quantum. identity

Source

Infrastructure & permits

Technical details (11)
Co located wind solar and storage mixed energy portfolio capacity — not IT load

Aggregate nameplate context

More than 1

Cooling system

Design

Air cooling planned for completed data center

Operational water design scope

Design company reported

Air-cooled design; domestic operational uses, with construction, fire protection and cleaning water permitted

Texas Water Fund — non project program

Company program not project capex

Wastewater project land control

Applicant representation

Applicant representative reports land purchase

Proposed domestic wastewater average daily flow — not water consumption

Proposed permit design

28,700 gallons/day

Battery power and energy capacity

Unknown

Not separately disclosed in reviewed current project announcements

Onsite generation infrastructure

Planned

Wind and solar with minority-share onsite gas firming; aggregate portfolio announcement does not resolve each technology rating.

Battery storage infrastructure

Planned

Battery included in >1 GW mixed portfolio; battery MW and MWh not independently disclosed in reviewed current project sources.

Cooling infrastructure

Planned

Air-cooled completed data center design; not observed operation.

Wastewater infrastructure

Application pending

Proposed domestic WWTP evaporation-pond disposal with no surface-water discharge. Numeric design is wastewater, not water consumption.

IP Meitner DTC WWTP WQ0016867001 permit or registration record · Pending; review/notice/registration date 2026-02-13. Technical completeness date, not permit issuance. Proposed wastewater design, not verified construction or actual flow.

Google–Intersect Meitner Energy Center

Pumpkin 1 A TABS2026014814 permit or registration record · Review complete; review/notice/registration date 2026-03-12. Registration is not completed construction. November 30, 2027 forecast; registered owner is distinct from state certification owner.

Google–Intersect Meitner Energy Center

Pumpkin 2 A TABS2026011989 permit or registration record · Registered; review/notice/registration date 2026-02-08. Registration is not completed construction. December 14, 2027 forecast.

Google–Intersect Meitner Energy Center

Pumpkin 3 A TABS2026014835 permit or registration record · Registered; review/notice/registration date 2026-03-12. Registration is not completed construction. April 18, 2028 forecast.

Google–Intersect Meitner Energy Center

Public-source research. Plans may change. See Evidence for sources and qualifications.