Google–Intersect Meitner Energy Center
- Headline capacity
- Not established in published records
- Updated
- Oct 28, 2026
Meitner combines a Google data center under construction in Gray County with Intersect's energy development in Gray and Roberts counties. The announced more-than-1-GW wind, solar and battery figure is a mixed energy-portfolio description, not data center IT capacity. Air cooling and majority-clean day-one power are design commitments, not operating results. State records distinguish IP Meitner DTC as registered owner, Google as occupant/operator and IP Meitner Land in building filings. A signed county abatement and pending domestic-wastewater application add regulatory detail, but benefits realized, site-level financing and IT load are not established. Google's Texas-wide investment and the two-center community fund are not Meitner capital.
Capacity
Operational water design scope
Planned / design or future potentialAir cooled design; domestic operational uses, with construction, fire protection and cleaning water permitted scope
SourceBattery power and energy capacity
Battery energy storageNot separately disclosed in reviewed current project announcements MW / MWh
Energy quantity; not power capacity
SourceBattery storage infrastructure
Battery energy storageBattery included in >1 GW mixed portfolio; battery MW and MWh not independently disclosed in reviewed current project sources. system
Energy storage capacity; not IT capacity
SourceOperating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
Participants
Occupant operator
Developer
Registered owner — state certification, not independently verified deed title
Building registered owner — Pumpkin building filings, not independently verified deed title
Agreement party operator
Registered operator
Capital & incentives
Capital claims
Three county two center community commitment — not Meitner capital
Multi county community program context$50,000,000
SourcePhase 1 anticipated initial capital cost
Project cost estimate not financingApproximately $1 billion
SourceAbatement property legal description acreage
Documented internal discrepancyPrinted total 1,744.24; listed parcels sum to 1,742.24 acres
SourceTax abatement with pilot
Executed not benefit commencement100% Qualifying property abatement, 10 years per phase. Qualifying county tax property per phase; PILOT phase 1 greater of 25% of real improvement county tax or $425,000; phases 2/3 greater of 20% or $350,000 each. Not net 75%/80% across all personal property. Commencement/conditions and benefits actually realized unverified; effective October 31, 2025. incentive scope
SourceIncentives
Abatement property legal description acreage
Documented internal discrepancy
Printed total 1,744.24; listed parcels sum to 1,742.24
Tax abatement with pilot
Executed not benefit commencement
100% qualifying-property abatement, 10 years per phase. Qualifying county-tax property per phase; PILOT phase 1 greater of 25% of real-improvement county tax or $425,000; phases 2/3 greater of 20% or $350,000 each. Not net 75%/80% across all personal property. Commencement/conditions and benefits actually realized unverified; effective October 31, 2025.
Site & development
Wastewater project land control
Applicant representationApplicant representative reports land purchase scope
SourceTechnical specifications
Co located wind solar and storage mixed energy portfolio capacity — not IT load
Aggregate nameplate contextMore than 1 GW
SourceProposed domestic wastewater average daily flow — not water consumption
Proposed permit design28,700 gallons/day
SourceOnsite generation infrastructure
PlannedWind and solar with minority share onsite gas firming; aggregate portfolio announcement does not resolve each technology rating. system
SourceCooling infrastructure
PlannedAir cooled completed data center design; not observed operation. system
SourceWastewater infrastructure
Application pendingProposed domestic WWTP evaporation pond disposal with no surface water discharge. Numeric design is wastewater, not water consumption. system
SourceAdditional project facts
Google closed Intersect acquisition in March (month only)
Completed; month precision2026-03 — Completed milestone
SourceMeitner data center state certification effective, not opening
Effective2026-04-27 — Effective milestone
SourceTwo center three county community commitment announced
Announced2026-10-14 — Announced milestone
SourceIP Meitner DTC WWTP WQ0016867001 permit or registration record
Wastewater land applicationPending; review/notice/registration date 2026-02-13. Technical completeness date, not permit issuance. Proposed wastewater design, not verified construction or actual flow. regulatory record
SourcePumpkin 1 A TABS2026014814 permit or registration record
Building accessibility registrationReview complete; review/notice/registration date 2026-03-12. Registration is not completed construction. November 30, 2027 forecast; registered owner is distinct from state certification owner. regulatory record
SourcePumpkin 2 A TABS2026011989 permit or registration record
Building accessibility registrationRegistered; review/notice/registration date 2026-02-08. Registration is not completed construction. December 14, 2027 forecast. regulatory record
SourcePumpkin 3 A TABS2026014835 permit or registration record
Building accessibility registrationRegistered; review/notice/registration date 2026-03-12. Registration is not completed construction. April 18, 2028 forecast. regulatory record
SourceQualifying large data center certification
CertifiedMeitner data center certification effective April 27, 2026. No exemption savings quantified. Certification is not commissioning, utilization or proof of realized tax benefits. incentive scope
SourceProject Pumpkin data center identity
Regulatory identity bridgeTCEQ wastewater file explicitly identifies Intersect new data center at Pumpkin site; IP Meitner DTC applicant. Separate from Roman and Quantum. identity
SourceInfrastructure & permits
Technical details (11)
Aggregate nameplate context
More than 1
Design
Air cooling planned for completed data center
Design company reported
Air-cooled design; domestic operational uses, with construction, fire protection and cleaning water permitted
Company program not project capex
Applicant representation
Applicant representative reports land purchase
Proposed permit design
28,700 gallons/day
Unknown
Not separately disclosed in reviewed current project announcements
Planned
Wind and solar with minority-share onsite gas firming; aggregate portfolio announcement does not resolve each technology rating.
Planned
Battery included in >1 GW mixed portfolio; battery MW and MWh not independently disclosed in reviewed current project sources.
Planned
Air-cooled completed data center design; not observed operation.
Application pending
Proposed domestic WWTP evaporation-pond disposal with no surface-water discharge. Numeric design is wastewater, not water consumption.
Project map
IP Meitner DTC WWTP WQ0016867001 permit or registration record · Pending; review/notice/registration date 2026-02-13. Technical completeness date, not permit issuance. Proposed wastewater design, not verified construction or actual flow.
Google–Intersect Meitner Energy Center
Pumpkin 1 A TABS2026014814 permit or registration record · Review complete; review/notice/registration date 2026-03-12. Registration is not completed construction. November 30, 2027 forecast; registered owner is distinct from state certification owner.
Google–Intersect Meitner Energy Center
Pumpkin 2 A TABS2026011989 permit or registration record · Registered; review/notice/registration date 2026-02-08. Registration is not completed construction. December 14, 2027 forecast.
Google–Intersect Meitner Energy Center
Pumpkin 3 A TABS2026014835 permit or registration record · Registered; review/notice/registration date 2026-03-12. Registration is not completed construction. April 18, 2028 forecast.
Google–Intersect Meitner Energy Center
Public-source research. Plans may change. See Evidence for sources and qualifications.