CyrusOne DUB1 Dublin Data Center Campus
- Planned critical IT
- 54 MW
- Updated
- Oct 28, 2026
- Utility
- EirGrid
CyrusOne DUB1 Dublin Data Center Campus, also known as CyrusOne DUB1, is a partially operational data center campus in Dublin, Leinster, IE associated with CyrusOne. Three two-story buildings; 22,854 square metres; potential 54 MW total IT capacity. Carrier-neutral Dublin campus with dual redundant power and renewable-energy sourcing. 54 MW is the potential three-building campus total. The first building is complete, but a phase-specific operating IT figure is not published.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
3 buildings
54 MW is potential IT capacity across three buildings, not verified operating load.
54 MW is the potential three-building campus total. The first building is complete, but a phase-specific operating IT figure is not published.
Milestones (2)
Jan 2020 · Recorded actual event
Completed · Announced
Source not linkedJan 2021 · Recorded actual event
Completed · Status changed
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- CyrusOne CyrusOne DUB1 profile · Aug 28, 2026 · Primary
Other participants (1)
Utility provider
Sources by role
Utility provider (1)
- CyrusOne sustainability reporting · Aug 30, 2026 · Primary
Site & development
Additional project facts
Capacity basis
ActualCyrusOne publishes 54 MW of critical IT capacity for this record boundary.
SourceCapacity basis
ActualCyrusOne currently describes 54 MW as the campus potential across three buildings. Earlier launch material cited 74 MW total power; Cartis publishes 54 MW only as a future IT envelope, not current operating load.
SourceCapacity basis
Actual54 MW is the potential three building campus total. The first building is complete, but a phase specific operating IT figure is not published.
SourceInfrastructure & permits
Technical details (5)
Energized
80 MVA active-active supply, dedicated electrical plant per floor, closed-loop cooling and diverse carrier-neutral fiber.
Operational
Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.
Energized
Carrier-neutral Dublin campus with dual redundant power and renewable-energy sourcing.
Operational
Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.
Secured or contracted
EirGrid connection agreement supports phased development; contracted supply is not disclosed operating IT.
Project map
Building · Issued
CyrusOne DUB1
An Bord Pleanála
Jan 1, 2021
Sources (1)
- CyrusOne sustainability reporting · Aug 30, 2026 · Primary
Public-source research. Plans may change. See Evidence for sources and qualifications.