Skip to content

PowerHouse Louisville Campus

Louisville, Kentucky, United StatesUnder construction
Evidence
Contracted
402 MW
Updated
Oct 28, 2026
Utility
Louisville Gas and Electric Company

PowerHouse and Poe are developing a 154-acre hyperscale campus on Camp Ground Road in Louisville. A revised development plan was approved in March 2026, while PowerHouse continues to market Q4 2026 delivery and a 525 MW maximum utility envelope.

Capacity

Initial delivery capacity

Forecast

130 MW

Source

Campus design power

Planned / design or future potential

400 MW

Source

Secured power capacity

Actual

335 MW

Source

Near term power capacity

Actual

402 MW

Source

Maximum utility power

Actual

525 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Initial deliveryUnder construction

1 building

Targeted first building and power tranche; an operating start has not been publicly announced.

Full campus envelopePlanned

Capacity and building-program bases conflict and must not be collapsed.

Milestones (3)
PowerHouse and Poe announce Louisville campus

Jan 16, 2025 · Recorded actual event

Completed · Announced

Source not linked
Planning Commission approves revised campus plan

Mar 5, 2026 · Recorded actual event

Completed · Permit approved

Source not linked
First 130 MW delivery target

Q4 2026 · Forecast / planned record

Forecast · Forecast completion

Source not linked

Site & development

Site area

Actual

154 acres

Source

Developable floor area

Design

1,800,000 square feet

Source

Building count

Design

Up to 6 buildings

Conflicting public evidence

Source

Building count

Actual

7 buildings

Conflicting public evidence

Source

Approved plan floor area

Actual

1,600,000 square feet

Source

On site substation

Design

Planned dedicated substation

Source

Additional project facts

Current status

Actual

Approved development plan; site clearing reported; pre delivery

Source

Announcement date

Actual

2025-01-16

Source

Initial delivery target

Forecast

October/Q4 2026

Source

Utility switch station target

Forecast

September 2026

Source

Infrastructure & permits

Technical details (6)
Electric grid

Planned or represented

130 MW

First tranche targeted for October/Q4 2026; not live capacity.

Electric grid

Secured or contracted

335 MW

Operator says the collaboration secured this initial supply level; contract record remains queued.

Electric grid

Planned or represented

402 MW

Near-term expansion statement and current homepage market figure.

Electric grid

Potential or planned

525 MW

Current project-page maximum; not operating IT load or current draw.

Electric grid

Planned or represented

lg and e switch station; target completion.

Electric grid

Planned or represented

On-site substation shown in development/approval sources; capacity and delivery remain unresolved.

Other · Issued

PowerHouse Louisville revised development plan

Louisville Metro Planning Commission

Mar 5, 2026

Sources (1)

Public-source research. Plans may change. See Evidence for sources and qualifications.