Skip to content

Beacon Indus AI Data Center Hub

About 3.2 km east of Calgary and 2.4 km northwest of Indus, Alberta, CanadaPreconstruction
Evidence
Headline capacity
Not established in published records
Updated
Oct 28, 2026

The Alberta Utilities Commission's current Indus project page, checked October 28, 2026, confirms that the oral hearing has been held and the power-plant application remains under consideration; this is not an approval decision. Beacon's Indus hub has an approved municipal planning envelope while its proposed 1,494 MWe on-site gas plant remains before the Alberta Utilities Commission. About 1,200 MWe would supply co-located data halls; IT load is unknown.

Capacity

Proposed generation capability

Proposal

1,494 MW

Indus on-site thermal power plant · Phase

Phase scope; not a whole-site figure

Source

Proposed power supplied to data halls

Planned / design or future potential

1,200 MW

Future co-located data halls · Phase

Phase scope; not a whole-site figure

Source

Reciprocating generation

Proposal

460 MW

Indus on-site thermal power plant · Phase

Phase scope; not a whole-site figure

Source

Combined cycle generation

Proposal

1,034 MW

Indus on-site thermal power plant · Phase

Phase scope; not a whole-site figure

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Approved 946-acre planning envelopeAnnounced or preconstruction

North, central and south development cells; individual development permits still required.

Future co-located data hallsAnnounced or preconstruction

About 1,200 MWe is proposed supply to halls, not IT load.

Indus on-site thermal power plantAnnounced or preconstruction

Proposed 1,494 MWe generation; hearing scheduled after cutoff.

Solar/agrivoltaics componentAnnounced or preconstruction

No capacity, approval or construction milestone established.

Milestones (4)
Beacon ASP and S-DAT bylaws adopted

Jun 17, 2025 · Recorded actual event

Completed · Permit approved

Source not linked
AUC power-plant application entered public process

Jan 19, 2026 · Recorded actual event

Completed · Permit filed

Source not linked
IAAC early decision

Mar 9, 2026 · Recorded actual event

Completed · Permit filed

Source not linked
Proceeding 30524 hearing scheduled

Aug 18, 2026 · Forecast / planned record

Forecast · Permit filed

Source not linked

Participants

Beacon Data Centers

Developer

Sources by role
Developer (1)
Developer (1)
Indus Power Generation LP

Developer

Sources by role
Developer (1)
Developer (1)
Northbridge Power GPC Inc.

Investor

Sources by role
Investor (1)
Other participants (6)
Alberta Utilities Commission

Government authority

Sources by role
Government authority (1)
Government authority (1)
Impact Assessment Agency of Canada

Government authority

Sources by role
Government authority (1)
Government authority (1)
INNIO Jenbacher

Supplier

Sources by role
Supplier (1)
Rocky View County

Government authority

Sources by role
Government authority (1)
Government authority (1)
Government authority (1)
Siemens Energy

Supplier

Sources by role
Supplier (1)
Stantec Consulting

Contractor

Sources by role
Contractor (1)

Site & development

Plan area

Permitted

946 acres

Approved 946-acre planning envelope · Phase

Source

Area structure plan

Permitted

Bylaw C-8638-2025 approved

Approved 946-acre planning envelope · Phase

Source

Land use redesignation

Permitted

Special, Data Centre district approved

Approved 946-acre planning envelope · Phase

Source

Construction jobs estimate

Reported rounded

1,500 jobs

Source

Technical specifications

Estimated daily water use

Reported rounded

1,500 m3 per day

Source

Additional project facts

Project status

Permitted

Proposed with active approvals

Source

Planning components

Permitted

Data center campus plus complementary solar/agrivoltaics

Approved 946-acre planning envelope · Phase

Source

Operational jobs estimate

Reported rounded

300 jobs

Source

Federal assessment status

Permitted

No further impact assessment required at early stage

Indus on-site thermal power plant · Phase

Source

Auc hearing

Forecast

2026-08-18

Indus on-site thermal power plant · Phase

Source

Proposed operating life

Proposal

25 years

Indus on-site thermal power plant · Phase

Source

Infrastructure & permits

Technical details (5)
Onsite natural gas generation

Planned or represented

1,494 MWe generation

onsite natural gas generation — 1494 MWe_generation; AUC application under review.

Electric grid

Planned or represented

1,200 MWe supply to halls

data hall power supply — 1200 MWe_supply_to_halls; proposed normal operating scenario.

Natural gas pipeline

Potential or planned

natural gas pipeline; options under evaluation.

Water supply

Potential or planned

1,500 m3 per day estimate

water supply — 1500 m3_per_day_estimate; source and approvals open.

Renewable energy supply

Planned or represented

solar agrivoltaics; approved planning concept; project not permitted.

Project map

Project map

1 of 1 project point mapped
Infrastructure facts
5
Mapped records
1
Capacity figures
3
Power & interconnection: 2Generation & storage: 2Cooling & water: 1
Building · Issued

Beacon AI Hub Area Structure Plan

Rocky View County

Jun 17, 2025

Sources (2)
Other · Under review

Beacon AI Centers — Indus Project Thermal Power Plant

Alberta Utilities Commission

Jan 19, 2026

Sources (3)
Other · Documented

Beacon AI Centers Indus Project

Impact Assessment Agency of Canada

Mar 9, 2026

Sources (2)

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (1)
eStruxture CAL-3 Rocky View

Under construction · Calgary metropolitan area, Alberta, Canada

Shared participant: Rocky View County · Same market: Alberta, Canada

Compare in a collection