About 3.2 km east of Calgary and 2.4 km northwest of Indus, Alberta, CanadaPreconstruction
Capacity
No public figure
Lead participant
Beacon Data Centers
Developer
Last updated
Aug 22, 2026
Most recent public record update

About Beacon Indus AI Data Center Hub

Beacon's Indus hub has an approved municipal planning envelope while its proposed 1,494 MWe on-site gas plant remains before the Alberta Utilities Commission. About 1,200 MWe would supply co-located data halls; IT load is unknown.

Projects sharing a market, utility, or organization.

1 related

Capacity

Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Onsite Generation1,494 MWProposal · Indus on-site thermal power plant
Design1,200 MWProposal · Future co-located data halls
Onsite Generation460 MWProposal · Indus on-site thermal power plant
Onsite Generation1,034 MWProposal · Indus on-site thermal power plant

Development

4 phases · 4 milestones
Approved 946-acre planning envelopeAnnounced Or Preconstruction

North, central and south development cells; individual development permits still required.

Future co-located data hallsAnnounced Or Preconstruction

About 1,200 MWe is proposed supply to halls, not IT load.

Indus on-site thermal power plantAnnounced Or Preconstruction

Proposed 1,494 MWe generation; hearing scheduled after cutoff.

Solar/agrivoltaics componentAnnounced Or Preconstruction

No capacity, approval or construction milestone established.

Jun 17, 2025
Beacon ASP and S-DAT bylaws adopted
Completed
Jan 19, 2026
AUC power-plant application entered public process
Completed
Mar 9, 2026
IAAC early decision
Completed
Aug 18, 2026
Proceeding 30524 hearing scheduled
Forecast

Infrastructure

Onsite Natural Gas GenerationPlanned Or Represented

1,494 MWe generation

onsite natural gas generation — 1494 MWe_generation; AUC application under review.

Electric GridPlanned Or Represented

1,200 MWe supply to halls

data hall power supply — 1200 MWe_supply_to_halls; proposed normal operating scenario.

Natural Gas PipelinePotential Or Planned

natural gas pipeline; options under evaluation.

Water SupplyPotential Or Planned

1,500 m3 per day estimate

water supply — 1500 m3_per_day_estimate; source and approvals open.

Renewable Energy SupplyPlanned Or Represented

solar agrivoltaics; approved planning concept; project not permitted.

Project map

1 of 1 project point mapped
Infrastructure facts
5
Mapped records
1
Capacity figures
3
Power & interconnection: 2Generation & storage: 2Cooling & water: 1

Facts & sources

Published claims and their source links.

15 facts
Project Status
Proposed with active approvals
Permitted
Plan Area
946 acres
Permitted
Area Structure Plan
Bylaw C-8638-2025 approved
Permitted
Land Use Redesignation
Special, Data Centre district approved
Permitted
Planning Components
Data center campus plus complementary solar/agrivoltaics
Permitted
Proposed Generation Capability
1,494 MWe
Proposal
Proposed Power Supplied To Data Halls
1,200 MWe
Proposal
Reciprocating Generation
460 MWe
Proposal
Combined Cycle Generation
1,034 MWe
Proposal
Estimated Daily Water Use
1,500 m3 per day
Reported Rounded
Construction Jobs Estimate
1,500 jobs
Reported Rounded
Operational Jobs Estimate
300 jobs
Reported Rounded
Federal Assessment Status
No further impact assessment required at early stage
Permitted
Auc Hearing
2026-08-18
Forecast
Proposed Operating Life
25 years
Proposal