Data center siteSite record

Crusoe–Lancium Childress AI Data Center Campus

Childress, Texas, United StatesPreconstruction
Capacity
1,000 MW
Planned / design
Lead participant
Crusoe
Developer · Operator
Last updated
Aug 24, 2026
Most recent public record update

About Crusoe–Lancium Childress AI Data Center Campus

Crusoe and Lancium have announced a 1-GW AI data center campus on 270 acres in Childress County, with construction expected to begin in the third quarter of 2026. Crusoe–Lancium Childress AI Data Center Campus is in Childress, TX, US and is a data center campus with preconstruction status. Participants include Crusoe as developer, Crusoe as operator, Lancium as landowner, Lancium as developer. Published specifications include 1000 MW planned capacity. Development comprises Announced 1-GW campus (preconstruction). Key milestones include Crusoe and Lancium announce 1-GW campus. (2026-07-15) and Construction expected during Q3 2026. (2026-09-30). grid interconnection — 1000 MW: Crusoe reports ERCOT approval for a grid-connected campus. energy storage: On-site storage planned; capacity not disclosed. Incentives include chapter 381 or tax abatement package (executed or approved scope unresolved) for Local materials concern Lancium development and may cover more than the announced Crusoe 1-GW campus.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Future Potential1,000 MWActual · Crusoe–Lancium Childress AI Data Center Campus
Design1,000 MWDesign · Crusoe–Lancium Childress AI Data Center Campus
Design1,000 MWDesign · Crusoe–Lancium Childress AI Data Center Campus

Development

2 phases · 4 milestones
Announced 1-GW campusAnnounced Or Preconstruction

No disclosed building-by-building sequencing.

Development programAnnounced Or Preconstruction

Project-wide phase for Crusoe–Lancium Childress AI Data Center Campus; capacity class is design.

Jul 15, 2026
Crusoe and Lancium announce 1-GW campus
Completed
Jul 15, 2026
Crusoe Childress 1 GW Campus development disclosed
Completed
Sep 30, 2026
Construction expected during Q3 2026
Forecast
Construction expected to begin in Q3 2026
Forecast

Infrastructure

Electric GridSecured Or Contracted

1,000 MW

Crusoe reports ERCOT approval for a grid-connected campus.

Battery StoragePlanned Or Represented

On-site storage planned; capacity not disclosed.

Cooling SystemPlanned Or Represented

Closed-loop non-evaporative cooling.

Electric GridPlanned Or Represented

1,000 MW

Crusoe and Lancium describe a 1.0 GW grid-connected campus design.

Site FacilityPlanned Or Represented

Lancium owns the land, secured the grid interconnect and manages energy infrastructure.

Project map

0 of 1 project point mapped
Infrastructure facts
5
Mapped records
1
Capacity figures
2

No map point available

Power & interconnection: 2Generation & storage: 1Cooling & water: 1Site systems: 1

Facts & sources

Published claims and their source links.

17 facts
Planned Power Capacity
1,000 MW
Actual
Site Area
270 acres
Actual
Construction Start Forecast
2026-Q3
Fact
Permanent Jobs Forecast
100 jobs more than
Actual
Cooling Design
Closed loop non evaporative
Actual
Location Context
Crusoe–Lancium campus | Childress County | Texas
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
1,000 MW
Design
Capacity Basis
Crusoe and Lancium describe a 1.0 GW grid connected campus design.
Actual
Location Context
Crusoe–Lancium campus | Childress County | Texas
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
1,000 MW
Design
Capacity Basis
Crusoe and Lancium describe a 1.0 GW grid connected campus design.
Actual
Development Scale
1 GW campus design
Actual
Development Milestone
270 Acres
Actual
Power Arrangement
Construction expected Q3 2026.
Actual
Site Configuration
Crusoe–Lancium campus | Childress County | Texas
Actual