DATA4 Frankfurt–Hanau Campus

Hanau / Großauheim, HE, GermanyUnder construction
Capacity
No public figure
Lead participant
DATA4 Group
Operator
Last updated
Aug 22, 2026
Most recent public record update

About DATA4 Frankfurt–Hanau Campus

DATA4 broke ground on its first German campus in Hanau in September 2025. The former military site is planned for a 180 MW electrical envelope and more than €2 billion of investment.

Capacity

Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Design180 MWDesign · Hanau phased full campus

Development

3 phases · 4 milestones
Grossauheim remediation and preparationUnder Construction

Former barracks remediation and recycled-material scope.

Hanau initial constructionUnder Construction

Historical first-module 2025 target is not treated as achieved.

1 building

Hanau phased full campusPlanned

Planned campus power and schedule, not current IT capacity.

Jul 21, 2022
P3 acquires former barracks site
Completed
Feb 15, 2023
DATA4 announces Hanau campus
Completed
Sep 15, 2025
DATA4 Hanau groundbreaking
Completed
Jan 1, 2032
Full Hanau buildout target
Forecast

Infrastructure

Electric GridPlanned Or Represented

180 MW

Available/reserved campus electricity, not current IT load.

Electric GridPlanned Or Represented

Rating and energization date unresolved.

Onsite GenerationPlanned Or Represented

Technology, fuel and approvals unresolved.

Heat ReusePlanned Or Represented

Intent only; no commissioned heat delivery.

Renewable Energy SupplyPlanned Or Represented

100 percent

Future operating-energy target, not current achieved supply.

Project map

0 of 1 project point mapped
Infrastructure facts
5
Mapped records
1
Capacity figures
2

No map point available

Power & interconnection: 3Generation & storage: 1Cooling & water: 1

Facts & sources

Published claims and their source links.

13 facts
Current Status
Under construction after groundbreaking
Actual
Site Area
25 hectares
Actual
Address
Depotstraße, 63457 Hanau
Actual
Campus Electrical Envelope
180 MW
Design
Current Announced Investment
More than €2 billion
Transaction Scope
Site History
Former Großauheim U.S. military barracks
Actual
Predecessor Sponsor
P3 Logistic Parks
Actual
Full Buildout Target
2032
Forecast
Substation
Planned
Design
Combined Heat And Power Plant
Planned
Design
Waste Heat Reuse
Intended for Hanau district heating
Design
Energy Target
100% Decarbonized source electricity
Forecast
Platform Owner
Brookfield Infrastructure
Actual