Data center siteSite record

CyrusOne PNW1 Quincy Data Center Campus

Quincy, Washington, United StatesPartially operational
Capacity
36 MW
Planned / design
Lead participant
CyrusOne
Developer
Last updated
Aug 30, 2026
Most recent public record update

About CyrusOne PNW1 Quincy Data Center Campus

CyrusOne PNW1 Quincy Data Center Campus, also known as CyrusOne PNW1, is a partially operational data center campus in Quincy, WA, US associated with CyrusOne. Approximately 720,000 square feet; 36 MW total IT capacity; additional land for potential development. Hydropower-backed Washington campus with low-cost utility supply, free cooling and major fiber routes.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load36 MWDesign · CyrusOne PNW1 Quincy Data Center Campus
Design36 MWDesign · CyrusOne PNW1 Quincy Data Center Campus
Design36 MWDesign · CyrusOne PNW1 Quincy Data Center Campus
Design36 MWDesign · CyrusOne PNW1 Quincy Data Center Campus

Development

2 phases · 3 milestones
Operating facility and documented expansionOperational

36 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Operating facility and documented expansionPartially Operational

36 MW is the operator-published facility or campus IT design boundary. It is not measured tenant utilization or live IT draw.

Aug 27, 2026
Primary project source reviewed for CyrusOne PNW1
Completed
Aug 28, 2026
Current source record reviewed for CyrusOne PNW1
Completed
Aug 30, 2026
Design capacity reviewed without inferring tenant utilization
Completed

Infrastructure

Electric GridEnergized

Hydropower-backed supply, low-water air-cooled infrastructure, long-haul fiber routes and high-density cabinet support.

Cooling SystemOperational

CyrusOne describes closed-loop or air-cooled systems; the profile does not infer facility water use beyond the cited site specification.

Electric GridEnergized

36 MW IT

Grant PUD hydropower-backed supply supports the current published IT boundary.

Electric GridEnergized

Hydropower-backed Washington campus with low-cost utility supply, free cooling and major fiber routes.

Cooling SystemOperational

Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.

Electric GridEnergized

Grant PUD hydropower supports the regional supply context; no tenant utilization is inferred.

Project map

0 of 1 project point mapped
Infrastructure facts
6
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 4Cooling & water: 2

Facts & sources

Published claims and their source links.

21 facts
Location Context
CyrusOne PNW1 | Quincy | WA | US
Actual
Lifecycle Status
Operational
Actual
Reported Capacity
36 MW
Design
Capacity Basis
CyrusOne publishes 36 MW of critical IT capacity for this record boundary.
Actual
Location Context
CyrusOne PNW1 | Quincy | WA | US
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
36 MW
Design
Capacity Basis
36 MW facility or campus design capacity.
Actual
Technical Area
720,000 square feet
Actual
Renewable Supply
Grant PUD hydropower
Actual
Tenant Tax Exemption
Washington sales tax exemption subject to qualification
Actual
Location Context
CyrusOne PNW1 | Quincy | WA | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
36 MW
Design
Capacity Basis
36 MW facility or campus IT design capacity.
Actual
Reported Capacity
36 MW
Design
Project Identity
CyrusOne PNW1
Actual
Location Context
Quincy, WA, US
Actual
Lifecycle Status
Partially operational
Actual
Development Detail
Approximately 720,000 square feet; 36 MW total IT capacity; additional land for potential development.
Actual
Capacity Basis
36 MW facility or campus IT design capacity.
Actual