Ascenty SCL03 Santiago
Quilicura, Santiago, RM, ChileOperating / Stabilized
Capacity
—
No public figure
Lead participant
Ascenty
Operator
Last updated
Aug 26, 2026
Most recent public record update
About Ascenty SCL03 Santiago
Ascenty inaugurated SCL03 in Quilicura in September 2025. The facility has 16 MW of reported total/site power, 1,500 racks and an 8,000-square-meter building on a 22,000-square-meter property, backed by a reported R$615.6 million investment.
Capacity
Operating capacity—An operating IT-capacity figure has not been publicly disclosed.
Reported Power16 MWActual · Ascenty SCL03 Santiago
Development
1 phases · 1 milestonesSCL03 operating facilityOperational
Distinct facility within the SCL01–03 first Santiago campus.
1 building
Sep 10, 2025
SCL03 inaugurated
CompletedInfrastructure
Electric GridOperational
16 MW total or site power
Operator does not expressly label it IT load in cited page.
Compute And Platform SystemOperational
1,500 racks
Facility page value.
Onsite GenerationOperational
70,080 kVA
Generator capacity with reported 48-hour diesel autonomy.
Electric GridOperational
Tri-bus topology and N+1 UPS.
Cooling SystemOperational
N+2 chilled-water plant.
FiberReported Context
PIT Chile connectivity/presence reported by operator.
FiberReported Context
Google Cloud Interconnect availability; no customer tenancy implied.
Project map
0 of 1 project point mappedInfrastructure facts
7
Mapped records
1
Capacity figures
3
No map point available
Power & interconnection: 2Generation & storage: 1Cooling & water: 1Fiber & connectivity: 2Site systems: 1
Facts & sources
Published claims and their source links.
Inauguration Date2025-09-10Actual
2025-09-10
Reported Power16 MWActual
16 MW
Rack Capacity1,500 racksActual
1,500 racks
Total Area22,000 square metresActual
22,000 square metres
Building Area8,000 square metresActual
8,000 square metres
Site Area22,000 square metresActual
22,000 square metres
Street AddressGuacolda 2100, Quilicura, Santiago 8710067Actual
Guacolda 2100, Quilicura, Santiago 8710067
Project Investment615,600,000 BRLTransaction Scope
615,600,000 BRL
Electrical TopologyTri busDesign
Tri bus
Generator Capacity70,080 kVAActual
70,080 kVA
Diesel Autonomy48 hoursDesign
48 hours
Ups RedundancyN+1Design
N+1
Cooling RedundancyN+2Design
N+2
Raised Floor Load1,833 kg per square metreDesign
1,833 kg per square metre
Renewable Energy Claim100 percentActual
100 percent
Digital Realty Ascenty Interest49 percentActual
49 percent