Skip to content

AI data center sites

Search sites, programs and supporting energy records by location, company, status or capacity.

1,114 public records · About catalogue coverage

Search property-level records across markets, participants, capacity, development activity, infrastructure and supporting evidence.

1,043 site records69 program records2 energy assets / agreements1,105 detailed profiles9 sourced research records

Record types partition the public catalogue; detailed and sourced-research labels describe those same records, not additional sites. Site records are not a deduplicated count of physical campuses. Overlapping campus, phase or tenant scopes must not be added together.

Clear all filters

Site and program directory

1,043 results · Page 8 of 21
Capacity stages and scopes differ; do not add figures together. How to compare

724 of 1043 matching records have an eligible headline. Select both basis and stage for a like-for-like view. Bounds, physical scope and reporting dates still differ; this is not an additive capacity total.

DataBank IAD2 McLean Data CenterSite · Connected record
McLean, Virginia, United States
DataBank Holdings, Ltd.
Operating
3 MW
Basis: Critical ITPlanned critical IT
DataBank Holdings, Ltd.
Oct 28, 2026
DataBank LAS1 Las Vegas Data CenterSite · Connected record
Las Vegas, Nevada, United States
DataBank
Operating
Not establishedIn published records
DataBank
Oct 28, 2026
DataBank LAX2 VernonSite · Connected record
Vernon, California, United States
DataBank Holdings, Ltd.Goodman Group
Construction
32 MW
Basis: Critical ITPlanned critical IT
Goodman Group
Oct 28, 2026
DataBank MSP2 Eagan Data CenterSite · Connected record
Eagan, Minnesota, United States
DataBank
Operating
5 MW
Basis: Critical ITPlanned critical IT
DataBank
Oct 28, 2026
DataBank SLC1 Salt Lake City Data CenterSite · Connected record
Salt Lake City, Utah, United States
DataBank
Operating
Not establishedIn published records
DataBank
Oct 28, 2026
DataBank SLC2 Granite Point Data CenterSite · Connected record
Bluffdale, Utah, United States
DataBank Holdings, Ltd.
Operating
3.3 MW
Basis: Critical ITPlanned critical IT
DataBank Holdings, Ltd.
Oct 28, 2026
Datagrid Southland AI FactorySite · Connected record
Makarewa, Southland, New Zealand
Datagrid New Zealand
Permitted
240 MW
Basis: Critical ITPlanned critical IT
Datagrid New Zealand
Oct 28, 2026
DataVolt Oxagon Net-Zero AI FactorySite · Connected record
Oxagon / NEOM, Saudi Arabia
DataVolt
Construction
1,500 MW
Basis: Basis not specifiedPlanned / design
DataVolt
Oct 28, 2026
DayOne Batam NVIDIA DSX AI Factory CampusSite · Connected record
Batam, KR, Indonesia
BP BatamDayOne Data Centers
Preconstruction
360 MW
Basis: Basis not specifiedPlanned / design
DayOne Data Centers
Oct 28, 2026
DayOne Chonburi Tech Park 1Site · Connected record
Amata City Chonburi Industrial Estate, Chonburi, Thailand
Amata CorporationDayOne Data Centers
Construction
300 MW
Basis: Critical ITPlanned critical IT
DayOne Data Centers
Oct 28, 2026
DayOne Chonburi Tech Park 2Site · Connected record
Chonburi, Thailand
Amata CorporationDayOne Data Centers
Preconstruction
Not establishedIn published records
DayOne Data Centers
Oct 28, 2026
DayOne Fuchu Tokyo CampusSite · Connected record
Fuchu / Kodaira, Tokyo, Japan
DayOne Data CentersGaw Capital Partners
Construction
80 MW
Basis: Critical ITPlanned critical IT
DayOne Data Centers
Oct 28, 2026
DayOne Lahti Data Center CampusSite · Connected record
Lahti / Kiveriö, Finland
City of LahtiDayOne Data Centers
Construction
Not establishedIn published records
Kiinteistö Oy Lahden Ilmarisentie 3
Oct 28, 2026
DayOne–Hyperco Kouvola Data CenterSite · Connected record
Kouvola / Koria / Hiivuri, Finland
City of KouvolaDayOne Data Centers
Construction
Not establishedIn published records
DayOne Data Centers
Oct 28, 2026
DC BLOX Conyers Data Center CampusSite · Connected record
Conyers, Georgia, United States
DC BLOXGeorgia Power
Construction
144 MW
Basis: Critical ITPlanned critical IT
DC BLOX
Oct 28, 2026
DC01UK South Mimms Data Center CampusSite · Connected record
South Mimms, England, United Kingdom
DC01UKEquinix, Inc.
Permitted
250 MW
Basis: Basis not specifiedPlanned / design
DC01UK
Oct 28, 2026
DCI Indonesia H2 Karawang CampusSite · Connected record
Pertiwi Lestari Industrial Estate, Karawang, JB, Indonesia
PT Datacenter Indonesia Sukses MakmurPT DCI Indonesia Tbk
Partially operational
600 MW
Basis: Critical ITPlanned critical IT
PT Datacenter Indonesia Sukses Makmur
Oct 28, 2026
Digital Carver Brickyard CampusSite · Connected record
Manassas, Virginia, United States
Digital Realty TrustVirginia Department of Environmental Quality
Construction
192 MW
Basis: Critical ITPlanned critical IT
Digital Realty Trust
Oct 28, 2026
Digital Carver Dulles 9 CampusSite · Connected record
Sterling, Virginia, United States
Digital Realty Trust
Construction
96 MW
Basis: Critical ITPlanned critical IT
Digital Realty Trust
Oct 28, 2026
Digital Carver Fechenheim CampusSite · Connected record
Frankfurt, Hesse, Germany
BlackstoneDigital Realty Trust
Preconstruction
Not establishedIn published records
Digital Realty Trust
Oct 28, 2026
Digital Carver Les Ulis CampusSite · Connected record
Les Ulis / Paris, Île-de-France, France
BlackstoneDigital Realty Trust
Preconstruction
Not establishedIn published records
Digital Realty Trust
Oct 28, 2026
Digital Edge CGK CampusSite · Connected record
Cikarang, West Java, Indonesia
Digital Edge
Construction
500 MW
Basis: Critical ITPlanned critical IT
Digital Edge
Oct 28, 2026
Digital Realty ACC4 Ashburn Data CenterSite · Connected record
Ashburn, Virginia, United States
Digital Realty Trust, Inc.
Operating
Not establishedIn published records
Digital Realty Trust, Inc.
Oct 28, 2026
Digital Realty ACC5 Ashburn Data CenterSite · Connected record
Ashburn, Virginia, United States
Digital Realty Trust, Inc.
Operating
Not establishedIn published records
Digital Realty Trust, Inc.
Oct 28, 2026
Digital Realty Astra Enterprise Park Data Center CampusSite · Connected record
Kansas City area, Missouri, United States
Digital Realty Trust
Preconstruction
600 MW
Basis: Utility / grid serviceUtility capacity
Digital Realty Trust
Oct 28, 2026
Digital Realty BCN1 BarcelonaSite · Connected record
Av. del Maresme 43, Sant Adria de Besos, CT, Spain
Digital Realty Trust
Operating
14 MW
Basis: Basis not specifiedPlanned / design
Digital Realty Trust
Oct 28, 2026
Digital Realty Bersama CGK10Site · Connected record
West Jakarta, JK, Indonesia
Bersama Digital Infrastructure AsiaDigital Realty Trust
Operating
Not establishedIn published records
Bersama Digital Infrastructure Asia
Oct 28, 2026
Digital Realty Bersama CGK11Site · Connected record
Central Jakarta, JK, Indonesia
Association of Indonesian Internet Service ProvidersBersama Digital Infrastructure Asia
Operating
32 MW
Basis: Critical ITPlanned critical IT
Bersama Digital Infrastructure Asia
Oct 28, 2026
Digital Realty HER1 CreteSite · Connected record
Epsilon & Theta Street, Building Block 18, Heraklion, CR, Greece
Digital Realty Trust
Operating
0.5 MW
Basis: Basis not specifiedPlanned / design
Digital Realty Trust
Oct 28, 2026
Digital Realty ICN11 Digital Seoul 2Site · Connected record
Gurae-dong, Gimpo, Greater Seoul, South Korea
Digital Realty TrustDigital Seoul 2 Ltd.
Construction
80 MW
Basis: Critical ITPlanned critical IT
Digital Realty Trust
Oct 28, 2026
Digital Realty ROM1 RomeSite · Connected record
Via delle Testuggini, Rome, Italy
Digital Realty TrustTechbau S.p.A.
Construction
3.2 MW
Basis: Critical ITPlanned critical IT
Digital Realty Trust
Oct 28, 2026
DP Facilities - Hannibal Gap Data CenterSite · Connected record
Hannibal, Ohio, United States
DP Facilities
Proposed
500 MW
Basis: Basis not specifiedPlanned / design
DP Facilities
Oct 28, 2026
Echelon DUB20 Arklow CampusSite · Connected record
Arklow / Avoca River Park, Ireland
Echelon Data CentresEirGrid
Construction
Not establishedIn published records
Echelon Data Centres
Oct 28, 2026
Eclairion Loire-sur-Rhone AI FactorySite · Connected record
Loire-sur-Rhone, Auvergne-Rhône-Alpes, France
EclairionEDF
Preconstruction
350 MW
Basis: Basis not specifiedPlanned / design
Eclairion
Oct 28, 2026
EcoDataCenter 2 Borlänge AI CampusSite · Connected record
Borlänge, Dalarna County, Sweden
EcoDataCenter
Construction
250 MW
Basis: Utility / grid serviceUtility capacity
EcoDataCenter
Oct 28, 2026
EcoDataCenter Falun CampusSite · Connected record
Falun / Ingarvet, W, Sweden
AreimAreim DC Fund
Operating
80 MW
Basis: Utility / grid serviceUtility capacity
Areim DC Fund
Oct 28, 2026
EcoDataCenter Kvarnsveden CampusSite · Connected record
Borlänge, W, Sweden
Borlänge MunicipalityByggPartner
Construction
600 MW
Basis: Basis not specifiedPlanned / design
Export Development Canada
Oct 28, 2026
EcoDataCenter Kvarnsveden First Data CenterSite · Connected record
Borlänge, W, Sweden
Construction
Not establishedIn published records
—
Oct 28, 2026
Edgecombe County AI Data Center ProposalSite · Connected record
Kingsboro / Tarboro area, North Carolina, United States
Edgecombe CountyEnergy Storage Solutions LLC
Cancelled
900 MW
Basis: Critical ITPlanned critical IT
Energy Storage Solutions LLC
Oct 28, 2026
EdgeConneX Kyotanabe AI CampusSite · Connected record
Kyotanabe / Greater Osaka, Japan
EdgeConneXKyotanabe City
Construction
200 MW
Basis: Basis not specifiedPlanned / design
EdgeConneX
Oct 28, 2026
EdgeConneX Phoenix Data CenterSite · Connected record
Tempe, Arizona, United States
EdgeConneX
Operating
Not establishedIn published records
EdgeConneX
Oct 28, 2026
EdgeCore Ashburn Data Center CampusSite · Connected record
Sterling, Virginia, United States
Dominion EnergyEdgeCore Digital Infrastructure
Construction
114 MW
Basis: Critical ITPlanned critical IT
EdgeCore Digital Infrastructure
Oct 28, 2026
EdgeCore Culpeper CampusSite · Connected record
Nalles Mill Road / Culpeper Technology Zone, Virginia, United States
Cielo Digital InfrastructureEdgeCore Digital Infrastructure
Preconstruction
196 MW
Basis: Critical ITPlanned critical IT
Cielo Digital Infrastructure
Oct 28, 2026
EdgeCore Florence Tech ParkSite · Connected record
Florence, Arizona, United States
EdgeCore
Proposed
720 MW
Basis: Basis not specifiedPlanned / design
EdgeCore
Oct 28, 2026
EdgeCore Louisa County CampusSite · Connected record
Louisa County, Virginia, United States
EdgeCore Digital Infrastructure
Preconstruction
1,100 MW
Basis: Critical ITPlanned critical IT
EdgeCore Digital Infrastructure
Oct 28, 2026
EdgeCore Mesa Data Center CampusSite · Connected record
Mesa, Arizona, United States
EdgeCore Digital Infrastructure
Partially operational
496 MW
Basis: Critical ITPlanned critical IT
EdgeCore Digital Infrastructure
Oct 28, 2026
Edged Project Atlas (Allentown)Site · Connected record
South Whitehall Township, Pennsylvania, United States
Edged Energy
Proposed
725 MW
Basis: Basis not specifiedPlanned / design
Edged Energy
Oct 28, 2026
EdgeMode DC Malpica AI Data Center CampusSite · Connected record
Mora, Castilla-La Mancha, Spain
EdgeMode
Preconstruction
300 MW
Basis: Basis not specifiedPlanned / design
EdgeMode
Oct 28, 2026
EDGNEX Jakarta AI Data Center CampusSite · Connected record
Jakarta, Jakarta metropolitan area, Indonesia
EDGNEX by DAMAC
Preconstruction
144 MW
Basis: Basis not specifiedPlanned / design
EDGNEX by DAMAC
Oct 28, 2026
Elea BEL1 Belém AI Data CenterSite · Connected record
Belém near Miramar substation, Pará, Brazil
Elea Data CentersI Squared Capital
Preconstruction
Not establishedIn published records
Elea Data Centers
Oct 28, 2026

Every figure carries its capacity stage. Operating, contracted, planned/design and utility-service values remain distinct; generation is never used as site capacity. A missing figure does not mean zero; other scoped figures may appear in the profile.