Echelon DUB20 Arklow Campus
About Echelon DUB20 Arklow Campus
Echelon's DUB20 campus at Avoca River Park is under construction with a reported 90 MW first phase and a 200 MW full-campus design. Current planning records cover three ICT buildings and separate energy-centre works.
Capacity
Development
2 phases · 9 milestonesReported 90 MW first phase; building allocation and achieved energization are not public.
Three ICT buildings are permitted; completion and operating capacity have not been publicly disclosed.
3 buildings
Infrastructure
220 kV
Joint Echelon/SSE substation linked to EirGrid and future Arklow Bank access.
2 energy-centre buildings
Separate generation infrastructure;
27 battery arrays in original plan
Original permit history includes 27 arrays; final installed configuration is unresolved.
6,000 MWh/year plus
Planned annual production, not instantaneous capacity.