Skip to content

DataBank LAX2 Vernon

Vernon, California, United StatesUnder construction
Evidence
Planned critical IT
32 MW
Updated
Oct 28, 2026

DataBank LAX2 is a 32 MW critical-IT data center under development at 3094 E. Vernon Avenue in Vernon, California. DataBank and Goodman Group announced a 50/50 joint venture for the facility in April 2026, after Goodman acquired the site in 2023 and secured power, planning and entitlements. DataBank’s current facility page lists 131,000 IT square feet, 32 MW of critical IT load, block-redundant power, N+2 cooling and 100% renewable-energy sourcing. The first 6 MW is expected in December 2026, with the remaining 26 MW scheduled in stages through September 2027, so the 32 MW figure represents the full design envelope rather than current operating load.

Capacity

Critical IT capacity

Design

32 MW

Source

First availability

Planned / design or future potential

6 MW

Source

Remaining staged capacity

Planned / design or future potential

26 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

LAX2 staged deliveryUnder construction

32 MW critical-IT facility with staged availability: 6 MW first, remaining 26 MW through Sep 2027.

Milestones (4)
Goodman acquired the Vernon site

2023 · Recorded actual event

Completed · Land acquired

Source not linked
DataBank and Goodman announced 50/50 LAX2 JV

Apr 7, 2026 · Recorded actual event

Completed · Announced

Source not linked
First 6 MW expected available in December 2026

Dec 2026 · Forecast / planned record

Forecast · Forecast completion

Source not linked
Remaining 26 MW expected online in stages through September 2027

Sep 2027 · Forecast / planned record

Forecast · Forecast completion

Source not linked

Participants

DataBank Holdings, Ltd.

Operator · Owner

Sources by role
Goodman Group

Developer · Owner

Sources by role

Site & development

Site acquisition year

Actual

2023

Source

Technical specifications

Renewable energy coverage

Design

100 percent

Source

Cooling redundancy

Design

N+2

Source

Additional project facts

IT space

Design

131,000 sq. ft.

Source

Joint venture share databank

Actual

50 percent

Source

Joint venture share goodman

Actual

50 percent

Source

Infrastructure & permits

Technical details (4)
Electric grid

Secured or contracted

Goodman secured power before the JV announcement; the facility page specifies block-redundant power.

Cooling system

Planned or represented

N+2 cooling design with 10kW+ cabinet-density air cooling capability.

Renewable energy supply

Planned or represented

100 percent

Current facility page states 100% renewable-energy source.

Fiber

Planned or represented

Current facility page states multiple onsite carriers.

Public-source research. Plans may change. See Evidence for sources and qualifications.