DataBank LAX2 Vernon
- Planned critical IT
- 32 MW
- Updated
- Oct 28, 2026
DataBank LAX2 is a 32 MW critical-IT data center under development at 3094 E. Vernon Avenue in Vernon, California. DataBank and Goodman Group announced a 50/50 joint venture for the facility in April 2026, after Goodman acquired the site in 2023 and secured power, planning and entitlements. DataBank’s current facility page lists 131,000 IT square feet, 32 MW of critical IT load, block-redundant power, N+2 cooling and 100% renewable-energy sourcing. The first 6 MW is expected in December 2026, with the remaining 26 MW scheduled in stages through September 2027, so the 32 MW figure represents the full design envelope rather than current operating load.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
32 MW critical-IT facility with staged availability: 6 MW first, remaining 26 MW through Sep 2027.
Milestones (4)
2023 · Recorded actual event
Completed · Land acquired
Source not linkedApr 7, 2026 · Recorded actual event
Completed · Announced
Source not linkedDec 2026 · Forecast / planned record
Forecast · Forecast completion
Source not linkedSep 2027 · Forecast / planned record
Forecast · Forecast completion
Source not linkedParticipants
Operator · Owner
Sources by role
Operator / Owner (1)
- DataBank and Goodman Group Partner to Open New Landmark Data Center in Los Angeles · Apr 7, 2026 · Primary
Operator (1)
- Los Angeles Vernon Data Center (LAX2) · Corroborating
Developer · Owner
Sources by role
Developer / Owner (1)
- DataBank and Goodman Group Partner to Open New Landmark Data Center in Los Angeles · Apr 7, 2026 · Primary
Site & development
Technical specifications
Additional project facts
Infrastructure & permits
Technical details (4)
Secured or contracted
Goodman secured power before the JV announcement; the facility page specifies block-redundant power.
Planned or represented
N+2 cooling design with 10kW+ cabinet-density air cooling capability.
Planned or represented
100 percent
Current facility page states 100% renewable-energy source.
Planned or represented
Current facility page states multiple onsite carriers.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.