CyrusOne NVA1–NVA3 Sterling Data Center Campus
Partially operational · Sterling, Virginia, United States
Northern Virginia campus/facility disclosed at 96 MW; wholly owned by Digital Realty after June 30, 2026. Digital Carver Dulles 9 Campus is located in Sterling, VA, US and is a data center campus in construction status. Participants include Digital Realty as developer, Digital Realty as operator, Digital Realty as owner. Published specifications include 96 MW of planned capacity. Development comprises Sterling Facility (under construction). Key milestones include Dulles 9 joint venture becomes wholly owned by Digital Realty (2026-06-30). data center it load — 96 MW: One 96 MW facility; planned IT load.
Projects sharing a market, utility, or organization.
Partially operational · Sterling, Virginia, United States
Partially operational · Sterling, Virginia, United States
Partially operational · Sterling, Virginia, United States
Partially operational · Sterling, Virginia, United States
One 96 MW facility; exact stabilization slot among the three acquired facilities is not public.
1 building
96 MW
One 96 MW facility; planned IT load.
No map point available
Published claims and their source links.