Data center siteSite record

Digital Carver Dulles 9 Campus

Sterling, Virginia, United StatesUnder construction
Capacity
96 MW
Planned / design
Lead participant
Digital Realty Trust
Developer · Operator · Owner
Last updated
Aug 25, 2026
Most recent public record update

About Digital Carver Dulles 9 Campus

Northern Virginia campus/facility disclosed at 96 MW; wholly owned by Digital Realty after June 30, 2026. Digital Carver Dulles 9 Campus is located in Sterling, VA, US and is a data center campus in construction status. Participants include Digital Realty as developer, Digital Realty as operator, Digital Realty as owner. Published specifications include 96 MW of planned capacity. Development comprises Sterling Facility (under construction). Key milestones include Dulles 9 joint venture becomes wholly owned by Digital Realty (2026-06-30). data center it load — 96 MW: One 96 MW facility; planned IT load.

Program relationships

1 linked

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Future Potential96 MWActual · Digital Carver Dulles 9 Campus

Development

1 phases · 1 milestones
Sterling FacilityUnder Construction

One 96 MW facility; exact stabilization slot among the three acquired facilities is not public.

1 building

Jun 30, 2026
Dulles 9 joint venture becomes wholly owned by Digital Realty
Completed

Infrastructure

Electric GridUnder Construction

96 MW

One 96 MW facility; planned IT load.

Project map

0 of 1 project point mapped
Infrastructure facts
1
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1

Facts & sources

Published claims and their source links.

6 facts
Facility Count
1 facility
Actual
Planned It Capacity
96 MW
Actual
Fully Leased
True
Actual
Digital Realty Wholly Owned From
True
Actual
Lease Term
15 years
Actual
Annual Lease Escalator
3.6 percent