Digital Realty BCN1 Barcelona
- Planned / design
- 14 MW
- Updated
- Oct 28, 2026
On September 30, 2026, Digital Realty announced that Blackfuel had selected BCN1 for a multi-megawatt AI inference deployment. The announcement does not disclose an exact MW allocation or service date and does not establish that all 14 MW of the facility's planned capacity is commissioned. Digital Realty opened BCN1 in Barcelona in May 2026 with 14 MW total planned capacity in a 15,000-square-meter building. Digital Realty BCN1 Barcelona is located in Av. del Maresme 43, Sant Adria de Besos, CT, ES and is a data center facility in operating status.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
1 building
One physical facility; 14 MW is total planned capacity, not proven commissioned load.
Milestones (2)
May 7, 2022 · Recorded actual event
Completed · Announced
Source not linkedMay 18, 2026 · Recorded actual event
Completed · Event type not stated
Source not linkedParticipants
Operator
Sources by role
Operator (1)
- Digital Realty opens first Barcelona data center · May 18, 2026 · Primary
Operator (1)
- BCN1 Barcelona data center · Corroborating
Site & development
Technical specifications
Additional project facts
Infrastructure & permits
Technical details (2)
Operational
Carrier-neutral Barcelona hub with regional terrestrial/subsea reach; cable systems and Marseille facilities are external.
Reported context
HVO100 reported for backup generation by secondary industry coverage.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.