EdgeCore Florence Tech Park
- Planned / design
- 720 MW
- Updated
- Oct 28, 2026
EdgeCore’s Florence, Arizona concept is a ten-building campus on roughly 230 acres. Town planning materials show ten two-story, 72 MW buildings, four campus areas and three substation areas; the 720 MW total is a design test fit, not permitted or operating capacity.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
10 buildings
EdgeCore’s Florence, Arizona concept is a ten-building campus on roughly 230 acres. Town planning materials show ten two-story, 72 MW buildings, four campus areas and three substation areas; the 720 MW total is a design test fit, not permitted or operating capacity.
Milestones (2)
Sep 18, 2025 · Recorded actual event
Completed · Permit filed
Source not linkedOct 7, 2025 · Recorded actual event
Completed · Status changed
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- EdgeCore Florence Tech Park public-record research record · Aug 28, 2026 · Primary
Site & development
Additional project facts
Infrastructure & permits
Technical details (1)
Planned or represented
790 MVA
Two 330 MVA and one 130 MVA substation areas shown.
Project map
Other · Under review
EdgeCore Florence
Town of Florence
Oct 7, 2025
Sources (1)
- EdgeCore Florence ten-building test fit · Sep 18, 2025 · Primary
Public-source research. Plans may change. See Evidence for sources and qualifications.