DC BLOX Conyers Data Center Campus

Conyers, Georgia, United StatesUnder construction
Evidence
Planned critical IT
144 MW
Updated
Oct 28, 2026
Utility
Georgia Power

DC BLOX is developing a hyperscale campus in Conyers, Georgia. Its current campus factsheet identifies three planned buildings, approximately 1.0 million square feet, 144 MW of critical capacity and 216 MW of gross utility capacity, with initial move-in targeted for December 2026. Georgia Power service, on-site substation, and a planned Atlanta dark-fiber ring.

Capacity

Reported capacity

Design

144 MW

Source

Capacity

Design

144 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Construction programUnder construction

DC BLOX Conyers Data Center Campus: Under construction.

Milestones (2)
DC BLOX Conyers Data Center Campus: Hyperscale campus in development; initial move-in targeted December 2026.

Jun 1, 2024 · Event timing type not established

In progress · Construction started

Source not linked
DC BLOX Conyers Data Center Campus — Under construction

Date not disclosed · Event timing type not established

In progress · Status changed

Source not linked

Participants

DC BLOX

Developer

Sources by role
Developer (1)
Other participants (1)
Georgia Power

Utility provider

Sources by role
Utility provider (1)

Site & development

Location context

Actual

DC BLOX Atlanta East campus | Conyers | Georgia | United States

Source

Location

Actual

Conyers, GA, US

Source

Development scale

Actual

Three buildings; about 1.0 million square feet

Source

Additional project facts

Lifecycle status

Actual

Construction

Source

Capacity basis

Actual

Source stated full build critical capacity; 216 MW gross utility capacity is separate

Source

Project identity

Actual

DC BLOX Conyers Data Center Campus

Source

Lifecycle status

Actual

Under construction

Source

Participant roles

Actual

DC BLOX, Georgia Power

Source

Capacity basis

Actual

144 MW planned or design IT capacity

Source

Infrastructure

Actual

Georgia Power service, on site substation, and a planned Atlanta dark fiber ring.

Source

Infrastructure & permits

Technical details (2)
Electric grid

Planned or represented

144 MW

144 MW planned or design IT capacity

Site facility

Planned or represented

Georgia Power service, on-site substation, and a planned Atlanta dark-fiber ring.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (2)
OpenAI Project Camellia

Preconstruction · Rincon / Savannah Gateway Industrial Hub, Georgia, United States

Shared participant: Georgia Power · Same market: Georgia, United States

Compare in a collection
QTS ATL2 East

Preconstruction · West of Veterans Parkway, Fayetteville, Georgia, United States

Shared participant: Georgia Power · Same market: Georgia, United States

Compare in a collection