Skip to content

DP Facilities - Hannibal Gap Data Center

Hannibal, Ohio, United StatesProposed
Evidence
Planned / design
500 MW
Updated
Oct 28, 2026

DP Facilities selected the former Ormet industrial site in Hannibal, Ohio for a hyperscale data center campus adjacent to the Long Ridge energy complex. Project materials describe more than 125 acres, 485 MW of onsite generation, up to 500 MW of utility redundancy, substantial Ohio River cooling-water access and diverse fiber routes.

Capacity

Reported capacity

Planned / design or future potential

500 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Powered-site developmentAnnounced or preconstruction

DP Facilities selected the former Ormet industrial site in Hannibal, Ohio for a hyperscale data center campus adjacent to the Long Ridge energy complex. Project materials describe more than 125 acres, 485 MW of onsite generation, up to 500 MW of utility redundancy, substantial Ohio River cooling-water access and diverse fiber routes.

Milestones (2)
DP Facilities announced Hannibal campus

Jun 24, 2019 · Recorded actual event

Completed · Announced

Source not linked
Long Ridge power plant target completion

Nov 2021 · Forecast / planned record

Forecast · Status changed

Source not linked

Participants

DP Facilities

Developer

Sources by role

Site & development

Location context

Actual

DP Facilities - Hannibal Gap Data Center | Hannibal | Ohio | US

Source

Site area

Reported rounded

125 acres

Source

Additional project facts

Lifecycle status

Actual

Proposed

Source

Capacity basis

Actual

500 MW future full build site capacity; not measured operating IT load.

Source

Permanent jobs range

Reported rounded

40–50 Jobs

Source

Infrastructure & permits

Technical details (3)
Onsite generation

Operational

485 MW

Long Ridge generation adjacent to campus.

Electric grid

Planned or represented

500 MW

Utility redundancy via existing 138 kV lines.

Water

Planned or represented

5.5 million gallons/day

Ohio River cooling access; upgradeable to 14 MGD.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (1)
MARA Long Ridge AI Data Center Campus

Preconstruction · Hannibal, Ohio, United States

Same locality: Hannibal

Compare in a collection