DP Facilities - Hannibal Gap Data Center

Hannibal, Ohio, United StatesProposed
Capacity
500 MW
Planned / design
Lead participant
DP Facilities
Developer
Last updated
Aug 28, 2026
Most recent public record update

About DP Facilities - Hannibal Gap Data Center

DP Facilities selected the former Ormet industrial site in Hannibal, Ohio for a hyperscale data center campus adjacent to the Long Ridge energy complex. Project materials describe more than 125 acres, 485 MW of onsite generation, up to 500 MW of utility redundancy, substantial Ohio River cooling-water access and diverse fiber routes.

Projects sharing a market, utility, or organization.

1 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Future Potential500 MWDesign · DP Facilities - Hannibal Gap Data Center

Development

1 phases · 2 milestones
Powered-site developmentAnnounced Or Preconstruction

DP Facilities selected the former Ormet industrial site in Hannibal, Ohio for a hyperscale data center campus adjacent to the Long Ridge energy complex. Project materials describe more than 125 acres, 485 MW of onsite generation, up to 500 MW of utility redundancy, substantial Ohio River cooling-water access and diverse fiber routes.

Jun 24, 2019
DP Facilities announced Hannibal campus
Completed
Nov 1, 2021
Long Ridge power plant target completion
Forecast

Infrastructure

Onsite GenerationOperational

485 MW

Long Ridge generation adjacent to campus.

Electric GridPlanned Or Represented

500 MW

Utility redundancy via existing 138 kV lines.

WaterPlanned Or Represented

5.5 million gallons/day

Ohio River cooling access; upgradeable to 14 MGD.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
3

No map point available

Power & interconnection: 1Generation & storage: 1Cooling & water: 1

Facts & sources

Published claims and their source links.

6 facts
Location Context
DP Facilities - Hannibal Gap Data Center | Hannibal | Ohio | US
Actual
Lifecycle Status
Proposed
Actual
Reported Capacity
500 MW
Design
Capacity Basis
500 MW future full build site capacity; not measured operating IT load.
Actual
Site Area
125 acres
Reported Rounded
Permanent Jobs Range
40–50 Jobs
Reported Rounded