EdgeCore is developing a 697-acre campus in Louisa County, Virginia, planned for six data center buildings and more than 1.1 GW of critical IT load. The county announced the site transaction, and Phase 1 site planning forms part of the preconstruction program. The 1.1 GW figure is the planned full-build IT design.

Projects sharing a market, utility, or organization.

2 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load1,100 MWDesign · EdgeCore Louisa County Campus
It Load1,100 MWDesign · EdgeCore Louisa County Campus
It LoadMore than 1,100 MW planned critical IT design capacityActual · EdgeCore Louisa County Campus

Development

1 phases · 2 milestones
Development programAnnounced Or Preconstruction

EdgeCore Louisa County Campus: Development program.

EdgeCore Louisa County Campus — Development program
In Progress
EdgeCore is developing a 697-acre campus in Louisa County, Virginia, planned for six data center buildings and more than 1.1 GW of critical IT load.
In Progress

Infrastructure

Electric GridPlanned Or Represented

1,100 MW

More than 1,100 MW planned critical IT design capacity

Site FacilityPlanned Or Represented

The 1.1 GW figure is the planned full-build IT design.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Site systems: 1

Facts & sources

Published claims and their source links.

12 facts
Location Context
EdgeCore Louisa County campus | Louisa County | Virginia | United States
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
1,100 MW
Design
Capacity Basis
Planned full build critical IT load; source says more than 1.1 GW
Actual
Project Identity
EdgeCore Louisa County Campus
Actual
Lifecycle Status
Development program
Actual
Location
Louisa County, Louisa County, VA, US
Actual
Participant Roles
EdgeCore Digital Infrastructure
Actual
Capacity
1,100 MW
Design
Capacity Basis
More than 1,100 MW planned critical IT design capacity
Actual
Development Scale
EdgeCore is developing a 697-acre campus in Louisa County, Virginia, planned for six data center buildings and more than 1.1 GW of critical IT load. The county announced the site transaction, and Phase 1 site planning forms part of the preconstruction program
Actual
Infrastructure
The 1.1 GW figure is the planned full build IT design.