DataVolt Oxagon Net-Zero AI Factory

Oxagon / NEOM, Saudi Arabia · 07Under construction
Evidence
Planned / design
1,500 MW
Updated
Oct 28, 2026

DataVolt announced on August 31, 2026 that construction was underway on the 360 MW first phase of its planned 1.5 GW Oxagon campus. HUMAIN and DataVolt plan to jointly develop a 100 MW tranche within that first phase, anticipated to be operational in 2028. The new primary phase-one figure is distinct from the older reported 300 MW estimate and is not operating capacity. The physical campus is in Oxagon / NEOM, Saudi Arabia, on land to be leased by Oxagon.

Capacity

Campus planned power envelope

Planned / design or future potential

1,500 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Phase 1Under construction

DataVolt’s August 31, 2026 announcement describes a 360 MW first phase under construction, including a planned 100 MW HUMAIN tranche anticipated in 2028. This supersedes the older reported 300 MW phase-one estimate; no operating capacity is claimed.

Future expansion to campus envelopePlanned

Future phases are planned within the announced 1.5-GW campus envelope.

Milestones (3)
DataVolt and NEOM/Oxagon announce the campus agreement

Feb 10, 2025 · Recorded actual event

Completed · Event type not stated

Source not linked
DataVolt announces rack-scale liquid-cooling relationship with Supermicro

May 13, 2025 · Recorded actual event

Completed · Event type not stated

Source not linked
Phase one expected operational during 2028

2028 · Forecast / planned record

Forecast · Event type not stated

Source not linked

Participants

DataVolt

Developer · Operator

Sources by role
Developer / Operator (1)
Developer / Operator (1)

Capital & incentives

Capital claims

Phase 1 initial investment commitment

Actual

$5 billion

Source

Site & development

Land tenure

Actual

Lease from oxagon

Source

Construction start verified

Source report

False

Source

Technical specifications

Renewable power ambition

Actual

100 percent

Source

Advanced cooling planned

Source report

True

Source

Subsea fiber access context

Source report

True

Source

Additional project facts

Phase 1 operations target

Actual

2028

Source

Net zero design ambition

Source report

True

Source

Customer identity public

Source report

False

Source

Host region type

Actual

Industrial development

Source

Infrastructure & permits

Technical details (3)
Renewable energy supply

Planned or represented

Ambition for campus to be entirely renewable; no contract, volume or energization milestone public.

Fiber

Reported context

Oxagon has Red Sea subsea-cable access; campus-specific circuits are not disclosed.

Cooling system

Planned or represented

Advanced cooling/net-zero design; vendor allocation and final design are open.

Public-source research. Plans may change. See Evidence for sources and qualifications.