DC01UK South Mimms Data Center Campus

South Mimms, England, United KingdomPermitted
Evidence
Planned / design
250 MW
Updated
Oct 28, 2026

DC01UK has planning approval for a major data center campus near South Mimms, Hertfordshire. Equinix acquired the project, whose economic study describes approximately 250 MW of capacity and 400 MVA of reserved power. Equinix, DC01UK is associated with the development in South Mimms, Hertsmere, England, GB. The disclosed development scope includes planning approved; approximately 250 MW design; 400 MVA reserved power; acquired by Equinix. Power and physical infrastructure include reserved grid power and a multi-building campus design. The official Hertsmere economic study describes about 250 MW of project capacity.

Capacity

Reported capacity

Planned / design or future potential

250 MW

Source

Reported capacity

Planned / design or future potential

250 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Development programAnnounced or preconstruction

Project-wide phase for DC01UK South Mimms Data Center Campus; capacity class is design.

Milestones (2)
Equinix DC01UK Hertfordshire development disclosed

Jan 1, 2026 · Recorded actual event

Completed · Announced

Source not linked
Planning approved; site acquired by Equinix

Date not disclosed · Forecast / planned record

Forecast · Forecast completion

Source not linked

Participants

DC01UK

Developer

Sources by role
Developer (1)
Equinix, Inc.

Owner

Sources by role
Owner (1)

Site & development

Location context

Actual

DC01UK site | South Mimms | Hertfordshire | United Kingdom

Source

Location context

Actual

DC01UK site | South Mimms | Hertfordshire | United Kingdom

Source

Development scale

Actual

Planning approved

Source

Development milestone

Actual

Approximately 250 MW design

Source

Site configuration

Actual

Acquired by Equinix.

Source

Technical specifications

Power arrangement

Actual

400 MVA reserved power

Source

Additional project facts

Lifecycle status

Actual

Permitted

Source

Capacity basis

Actual

The official Hertsmere economic study describes about 250 MW of project capacity.

Source

Lifecycle status

Actual

Permitted

Source

Capacity basis

Actual

The official Hertsmere economic study describes about 250 MW of project capacity.

Source

Infrastructure & permits

Technical details (2)
Electric grid

Planned or represented

250 MW

The official Hertsmere economic study describes about 250 MW of project capacity.

Site facility

Planned or represented

Reserved grid power and a multi-building campus design.

Other · Issued

DC01UK South Mimms Data Center Campus

Hertsmere Borough Council

Jan 23, 2025

Sources (2)