Skip to content

EdgeCore Ashburn Data Center Campus

Sterling, Virginia, United StatesUnder construction
Evidence
Planned critical IT
114 MW
Updated
Oct 28, 2026
Utility
Dominion Energy

On April 21, 2026, EdgeCore announced US$1.5 billion of construction financing for its two fully leased Ashburn facilities. The operator forecasts initial occupancy for AS01 in November 2026 and AS02 in July 2027; neither date is treated as an achieved opening and the shared financing is not arbitrarily divided between buildings. EdgeCore is developing two data centers less than two miles apart on Maries Road and Moran Road in Sterling, Virginia. Together the official Ashburn campus plan provides 114 MW of critical IT load across 685,000 square feet, with initial delivery targeted for late 2026. Dominion Energy service, high-density cooling design, and low-water closed-loop systems.

Capacity

Reported capacity

Design

114 MW

Source

Capacity

Design

114 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Construction programUnder construction

EdgeCore Ashburn Data Center Campus: Under construction.

Milestones (2)
EdgeCore Ashburn Data Center Campus: Two-site campus under construction; initial delivery targeted late 2026.

Date not disclosed · Event timing type not established

In progress · Construction started

Source not linked
EdgeCore Ashburn Data Center Campus — Under construction

Date not disclosed · Event timing type not established

In progress · Status changed

Source not linked

Participants

EdgeCore Digital Infrastructure

Developer

Sources by role
Developer (1)
Other participants (1)
Dominion Energy

Utility provider

Sources by role
Utility provider (1)

Site & development

Location context

Actual

Maries Road and Moran Road locations | Sterling | Virginia | United States

Source

Location

Actual

Sterling, VA, US

Source

Development scale

Actual

Two data centers; 685,000 square feet

Source

Additional project facts

Lifecycle status

Actual

Construction

Source

Capacity basis

Actual

Source stated combined full build critical IT load for both Ashburn locations

Source

Project identity

Actual

EdgeCore Ashburn Data Center Campus

Source

Lifecycle status

Actual

Under construction

Source

Participant roles

Actual

EdgeCore Digital Infrastructure, Dominion Energy

Source

Capacity basis

Actual

114 MW planned or design IT capacity

Source

Infrastructure

Actual

Dominion Energy service, high density cooling design, and low water closed loop systems.

Source

Infrastructure & permits

Technical details (2)
Electric grid

Planned or represented

114 MW

114 MW planned or design IT capacity

Site facility

Planned or represented

Dominion Energy service, high-density cooling design, and low-water closed-loop systems.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (4)
CyrusOne NVA1–NVA3 Sterling Data Center Campus

Partially operational · Sterling, Virginia, United States

Same locality: Sterling

Compare in a collection
CyrusOne NVA4 Sterling Data Center

Partially operational · Sterling, Virginia, United States

Same locality: Sterling

Compare in a collection
CyrusOne NVA5–NVA7 Sterling Data Center Campus

Partially operational · Sterling, Virginia, United States

Same locality: Sterling

Compare in a collection
CyrusOne NVA8 Sterling Data Center

Partially operational · Sterling, Virginia, United States

Same locality: Sterling

Compare in a collection